7-100
7.6 Carrier Base Section
3. Remove the E-ring and then the roller.
4. Remove the E-ring, then the shaft, spring and
arm.
Installation
Installation is essentially in the reverse order of
removal.
Removal
1. Remove the carrier lock assembly
2. Remove the E-ring, then the shaft, arm and
spring.
Installation
Installation is essentially in the reverse order of
removal.
Removal
1. Remove:
• Roller arm
.
• Lock release arm
2. Remove the screw and then the stopper.
Z
2
390
Arm
Spring
E-ring
Roller
E-ring
Shaft
7.6.7
Lock Release Arm Replacement
Z
2
391
Shaft
E-ring
Spring
Arm
7.6.8
Lock Arm Replacement
Z
2
392
Screw
Stopper