
87
INZ-TN2ZPB-E
9.4 Outline diagram
(Unit : mm)
Mounting method
The analyzer weight should be sup-
ported at the bottom of the case.
(
Power Inlet Type(100V to 240V AC 50/60Hz))
(M4 Terminal Block Type
)
(M4 Terminal Block Type
)
<REAR VIEW>
<SIDE VIEW>
<FRONT VIEW>
<TOP VIEW>
429
7
1
32.5
57
.2
463
415
380
2
24
16
25
1
24.5
396
483
Purge Gas Inlet Rc1/4 or NPT1/4
Sample Gas Inlet Rc1/4 or NPT1/4
Sample Gas and reference gas Outlet Rc1/4 or NPT1/4
Analog Output Connector (A/O)
Power
Switch
Fuse
Power Inlet(100V to 240V AC 50/60Hz)
Reference Gas Inlet Rc1/4 or NPT1/4
Communication
Connector (RS485)
Analog Input
Connector (A/I)
Digital Input/output Connector (DIO1 to 3)
Flowmeter
465
450 or more
57
.2
19-inch rack mounting type
<Rack dimensions>
Mounting diagram
Guide rails
Guide rails