![Fuji Electric POD UG Series User Manual Download Page 54](http://html1.mh-extra.com/html/fuji-electric/pod-ug-series/pod-ug-series_user-manual_2341805054.webp)
6-6
2. Main Menu Screen
RS-485 signal test
Turn the [CN1] and [RS485] switches on.
•
SD/RD Test
Check the signals [SD] and [RD].
1.
Install a jumper between pins 12 and 24 and between pins 13 and 25 of CN1 on the Simple
POD unit.
2.
Press the [Self-Loop Test] switch. When the [OK] lamp lights up, the test is successfully
completed.
* If the [NG] lamp lights up, consult your local distributor.
•
CTS/RTS Test
Check the signals [CTS] and [RTS].
1.
Install a jumper between pins 14 (+RTS) and 19 (+CTS) of CN1 and between pins 17 (
−
RTS)
and 18 (
−
CTS) on the backside of the Simple POD unit.
2.
Press the [RTS] switch and check that both [RTS] and [CTS] lamps light up at the same time.
Press the [RTS] switch again and check that both [RTS] and [CTS] lamps go off at the same
time.
CN1
RS232C
MJ1
RS485
Communication Port
Self-Loop Test
CTS
RTS
NG
OK
Self-Loop Test
CTS
RTS
NG
OK
Self-Loop Test
CTS
RTS
NG
OK
Self-Loop Test
CTS
RTS
NG
OK
Self-Loop Test
CTS
RTS
NG
OK
Self-Loop Test
CTS
RTS
NG
OK
Summary of Contents for POD UG Series
Page 9: ...11 Features 2 Models and Peripheral Equipment 3 System Composition Overview...
Page 15: ...1 6 3 System Composition Please use this page freely...
Page 28: ...2 12 5 Modular Jack MJ1 Please use this page freely...
Page 29: ...31 Mounting Procedure 2 Power Supply Cable Connection Installation...
Page 48: ...61 Operational Procedures 2 Main Menu Screen Simple POD Operations...
Page 65: ...71 Error Messages 2 Troubleshooting Error Correction...
Page 72: ...81 Inspection and Maintenance 2 Warranty Policy Inspection and Maintenance...