background image

- 6 - 

 

Chaper 2   INSTALLING THE INTERFACE CARD 

2.1  Removing the Front Cover 

 

•  Incorrect handling in installation/removal jobs could result in a broken produce. 

•  Before installing or removing the interface card, shut down the input power to the inverter and make sure that 

the  charging  lamp is  turned  OFF.  Even  if  all  of  the  input  power  to  the main  circuit  and  control  circuit  and  the 
auxiliary power are shut down, however, power is still applied to the inverter control terminals 30A, 30B, 30C, 
Y5A and Y5B when the external control circuit is supplied with power from a separate power supply. Shut down 
the  power  of  the  external  equipment  for  prevention  of  electric  shock.  Shut  down  the  power  of  the  external 
equipment for prevention of electric shock. 

 

Remove the front cover from the inverter as shown below. The removal procedure differs depending on the inverter 
type (capacity). 

FRN22VG1S-2J/4J (22 kW) or lower types 

   

FRN30VG1S-2J/4J (30 kW) or upper types 

 

As shown in Figure 2.1-1, loosen the cover mounting 
screw on section "a" and pull out the upper end of the 
front cover towards you. 

 

     

(1)  As shown in Figure 2.1-2, remove the cover 

mounting screws (the number of screws differs 
depending on the inverter capacity) on section "b" 
and remove the front cover. 

(2)  Open the keypad enclosure. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

Figure 2.1-1  Removing the Front Cover 

FRN22VG1S-2J/4J (22 kW) or lower types 

   

Figure 2.1-2  Removing the Front Cover 

FRN30VG1S-2J/4J (30 kW) or upper types 

 

a

Keypad 
enclosure

Control printed 

circuit board

(Control PCB)

b

Summary of Contents for OPC-VG1-DIO

Page 1: ...ing might result in incorrect operation a short life or even a failure of this product Deliver this manual to the end user of this product Keep this manual in a safe place until this product is discar...

Page 2: ...fore proceeding to operate the inverter Safety precautions are classified into the following two categories in this manual Failure to heed the information indicated by this symbol may lead to dangerou...

Page 3: ...ter Otherwise an accident could occur Maintenance and inspection and parts replacement Before proceeding to the maintenance inspection jobs turn OFF the power and wait at least five minutes for invert...

Page 4: ...the interface card Model OPC VG1 DIO 2 The interface card is not damaged during transportation 3 The following accessories are also contained in the package Three screws M3 Three spacers One plug One...

Page 5: ...the interface card in an airtight vinyl sheet or the like for storage 3 If the interface card is to be stored in a high humidity environment put a drying agent such as silica gel in the airtight pack...

Page 6: ...tion of electric shock Shut down the power of the external equipment for prevention of electric shock Remove the front cover from the inverter as shown below The removal procedure differs depending on...

Page 7: ...ption mount provided on the control PCB 2 Mount the interface card so that connector CN1 on the card comes to be connected to connector B port on the control PCB 3 Secure the interface card with three...

Page 8: ...s November 2011 First edition Copyright 2011 Fuji Electric Co Ltd No part of this publication may be reproduced or copied without prior written permission from Fuji Electric Co Ltd All products and co...

Reviews: