![Fuji Electric Frenic-Sce Instruction Manual Download Page 15](http://html1.mh-extra.com/html/fuji-electric/frenic-sce/frenic-sce_instruction-manual_2341867015.webp)
R
F
Direct current
reactor (option)
DB
N
(-)
P(+)
P1
U
V
W
U
V
W
M
3~
C
L1/R
L2/S
L3/T
G
Ground
terminal
(Note 6)
TH1
THC
PTC
thermistor
To [11]
To [C1]
)
R1
T1
R0
T0
Auxiliary power
input for fan
(Note 5)
{
(Note 11)
DC/DC
(PLC)
(FWD)
(REV)
(X1)
(X2)
(X3)
(X4)
(X5)
(CM)
(EN1)
SINK
SOURCE
(EN2)
0V
+24VDC
Run forward command (
FWD
)
Run reverse command (
REV
)
Tank High Level
detection (
TANK HL
)
<Y1>
<Y2>
<CMY>
[FM]
[11]
0V
G
E
DX+
DX-
SW6
(Note 12)
SW1
(Note 12)
(Note 8)
(Note 9)
(Note 10)
(Note 10)
Safety signal
SW5
(Note 12)
30C
30B
30A
Alarm output
(
ALM
)
30
Current output
(4(0) to 20 mA DC)
Voltage output
(0 to +10 V DC)
Pulse output
(25 to 32kp/s)
・
Power supply voltage switching
connector “CN UX”
・
Fan power supply connector “CN R” /
“CN W”
(Note 10)
CAN+
CAN-
SW6
(Note 12)
RJ45 Connector
(Note 9)
(Note 14)
(PLC)
Charge
lamp
RJ45 connector
SW2
(Note 12)
Option
connector
FMI
FMV
FMP
Motor
Data transmission and
reception (RS-485)
Keypad
Detachable terminal block
Voltage input V2
(0 to +10 V DC)
〔
11
〕
〔
12
〕
〔
13
〕
(Note 9)
+10VDC
Current input C1
(4(0) to 20 mA DC)
PTC thermistor input
0V
〔
C1
〕
Voltage input 12
(0 to +10VDC)
(0 to ±10VDC)
SW4
PTC
AI
(Note12)
(Note 12)
SW3
C1
V2
0V
Grounding
terminal
Tank level
detection (
TANK
LEVEL
)
(Note 15)
(Note 15)
(Note 15)
U1
U2
CN UX
FAN NC
CN R CN W
Circuit breaker
(MCCB)
R1
R2
Rx
TANK FULL
LOW POWER
(+)
(-)
(Note 4)
Figure 2.2-2 Wiring diagram when inverter is supplied from PV panel connected to AC input and N(-) terminals.
2-5
Summary of Contents for Frenic-Sce
Page 10: ......