![FS NC8400 Series Quick Start Manual Download Page 11](http://html1.mh-extra.com/html/fs/nc8400-series/nc8400-series_quick-start-manual_2340720011.webp)
NC8400-4TH
3. Attach the vertical cable managers to the rack using four M6*25 screws and nuts.
Installing the Vertical Cable Managers
1. The four M6*16 screws and nuts on the mounting brackets should be removed before installing
the vertical cable managers.
2. Remove the handles on the mounting brackets.