Installation Requirements
Before you begin the installation, make sure that you have the followings:
Category 5e or higher RJ-45 Ethernet cables, fiber optical cables and console cable for
connecting network devices.
Phillips screwdriver.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Site Environment:
Do not operate it in an area that exceeds an ambient temperature of 50°C.
The installation site must be free from leaking or dripping water, heavy dew, and humidity.
Ensure rack and working platforms are well earthed.
Standard-sized, 19" wide rack with a minimum of 1U height available.
Be sure that the switch is level and stable to avoid any hazardous conditions.
Do not install the equipment in a dusty environment.
PoE
Status M1 M2
PWR1 PWR2 PoE
1
2
2
3
4
5
6
7
8
9
10
11
12
12
14
24
13
14
15
16
17
18
19
20
21
22
23
24
Green=1000M
Yellow=10/100M
On=Link Flashing=A
CT PoE LED:Gr
een=Good Supply
Yellow=Over Load
Console
25F
26F
27F
RG-S2910-24GT2XS
-UP-E
SFP+