1-6
Pressure
(m bar)
Gas
Single
Vat
Natural Gas Lacq
(G20) under 20 m bar
7
Natural Gas Gronique
*
(G25) under 25 m bar
10
Natural Gas Gronique
(G25) under 20 m bar
10
Butane/Propane
(G30) at 28/30 or 50 mbar
17
Propane
(G31) under 37 or 50 m bar
20
CE Standard
Burner M anifold Gas Pressures
* Belgian G25 = 7,0 m bar
Gas
Pressure
Natural
3" W.C.
0.73 kPa
Propane
8.25" W.C.
2.5 kPa
Non-CE Standard
Burner Manifold Gas Pressures
6.
To adjust the burner gas pressure, remove the cap from the gas valve regulator and adjust to the correct pressure.
Non-CE
Valve
CE
Valve
GAS VALVE REGULATOR CAP
7.
Place the fryer power switch (and the gas valve in non-CE fryers) in the OFF position. Remove the fitting from
the pressure tap hole and reinstall the pressure tap plug.
1.8
Measuring Flame Current
When the burner flame is properly adjusted, it will produce a current between 2.5
A and 3.5
A. Flame current is
measured by placing a
microamp
(not milliamp) meter in series with the sensing wire on the ignitor. This is
accomplished as follows:
1.
Place the fryer power switch in the OFF position.
Summary of Contents for FootPrint OCF30G
Page 9: ...1 3...
Page 46: ...1 40 1 16 Principal Wiring Connections...
Page 47: ...1 41 1 17 Wiring Diagrams 1 17 1 FPGL230 430 Wiring 120V CE and Export...
Page 48: ...1 42 1 17 1 2 FPGL230 430 Wiring 250V Australia...
Page 49: ...1 43 1 17 2 FPGL330 Wiring 120V CE and Export...
Page 50: ...1 44 1 17 2 2 FPGL330 Wiring 250V Australia...
Page 51: ...1 45 1 17 3 FPGL430 Extra Transformer Box Wiring...
Page 52: ...1 46 1 17 4 Modular Basket Lift 100 120V...
Page 53: ...1 47 1 17 5 Modular Basket Lift 208 250V...
Page 54: ...1 48 1 17 6 Basket Lift Interface Harness...
Page 55: ...1 49 1 18 Simplified Wiring Diagrams 1 18 1 FPGL30 Series Full Vat with Dual Spark Module...
Page 56: ...1 50 1 18 2 FPGL30 Series Full Vat Single Spark Module excluding Australia...
Page 58: ...1 52 1 18 4 FPGL30 Series Simplified Wiring with 3000 Controller...
Page 59: ...1 53 1 18 5 FPGL30 Series Data Network Flowchart...
Page 60: ...1 54 1 18 6 Shortening Melting Unit Wiring Diagram prior to Mar 2012...
Page 61: ...1 55 1 18 6 2 Shortening Melting Unit Wiring Diagram after Mar 2012...
Page 62: ...1 56 1 18 7 Bulk Oil Wiring 1 18 7 1 FPGL230 430 Wiring 120V CE and Export Bulk Oil...
Page 63: ...1 57 1 18 7 2 FPGL230 430 Wiring 250V Australia Bulk Oil...
Page 64: ...1 58 1 18 7 3 FPGL330 Wiring 120V CE and Export Bulk Oil...
Page 65: ...1 59 1 18 7 4 FPGL330 Wiring 250V Australia Bulk Oil...
Page 66: ...1 60 1 18 8 Bulk Oil Box Wiring...
Page 67: ...1 61 1 19 Capable Controls Ignition Module Wiring Diagrams...
Page 69: ...2 2 2 2 Basket Lift Assy and Associated Parts...
Page 73: ...2 6 2 4 2 Drain Tube Sections and Associated Parts See Section 2 4 1 for Drain Valves...
Page 75: ...2 8 2 5 2 Component Boxes...