background image

4-6 

Reassembly

 

 
1.  Place the two outer screens together and align their edges.

 

Ensure hole is on
same side as
handle.

Steps 1 and 2 - Stack outer screens
and insert edges into frame.

Step 3 - Insert grid between screens
after screens have been positioned in
frame.

Step 4 - Connect corner and pivot
frame over free edges of screens.

 

2. 

Insert the screens into one of the frame halves (it doesn’t matter which one).  Ensure that the hole in the 
top screen is on the same side of the frame as the handle. 

 

3. 

Slip the grid between the screens so that the threaded fitting on the grid goes through the hole in the top 
screen and the grid is centered between the edges of the screens. 

 

4. 

Connect the other half of the frame at the corner opposite the handles and pivot the frame onto the free 
edges of the screen.  

 

5. 

Screw the standpipe onto the threaded fitting and hand tighten. 

 

 

Summary of Contents for 824E

Page 1: ...ment Service Association recommends using CFESA Certified Technicians Price 6 00 8195700 24 Hour Service Hotline 1 800 551 8633 819 5700 March 2003 Flatbottom Series Electric Fryers Models 1824E 2424E...

Page 2: ...assemblies must be hardwired using flexible conduit to the terminal block located on the rear of the fryer These fryers should be wired to NEC specifications Hardwired units must include installation...

Page 3: ...mbust if left soaking in certain shortening material Additional information can be obtained in the filtration manual included with the system WARNING No structural material on the fryer should be alte...

Page 4: ...2 4 3 OPERATION AND ROUTINE MAINTENANCE 3 1 3 1 Start Up 3 1 3 2 General Use of the Fryer 3 2 3 3 Draining and Manual Filtering of Fryers without Built In Filtration 3 3 3 4 Shut Down 3 3 3 5 Cleaning...

Page 5: ...0V or 480V Fryer operation is controlled by a standard thermostat control or an optional solid state controller The controls whichever type are mounted inside the cabinet behind the door on or near th...

Page 6: ...o have carefully read the information in this manual and have familiarized themselves with the equipment functions or who have had previous experience with the operation of the equipment covered in th...

Page 7: ...Dean Factory Authorized Service Center FASC Service information may also be obtained by calling the Frymaster Technical Services Department 1 800 551 8633 or 1 318 865 1711 In order to assist you quic...

Page 8: ...diagrams furnished with the equipment Wiring diagrams are located on the inside of the fryer door All installation and service on Dean equipment must be performed by qualified certified licensed and...

Page 9: ...ts installation location Do not push fryers with legs in an attempt to adjust the fryer position Lift the fryer slightly and place it where it is to be installed Pushing a unit increases the possibili...

Page 10: ...n a stationary position 5 If the fryer is equipped with a power cord plug the cord securely into a properly grounded outlet of appropriate voltage for the specific fryer configuration If the fryer is...

Page 11: ...on the inside of the frypot This film should be periodically removed by following the boilout procedure Boilout the frypot s in accordance with the procedure below before filling with cooking oil or s...

Page 12: ...press the POWER switch to the OFF position If you are not a Frymaster Dean certified technician call your local FASC for service DO NOT attempt to operate the fryer until the problem has been correct...

Page 13: ...result if water is allowed into the filtration system and all applicable warranties will be voided 8 Refill and rinse the frypot s with cold water twice Drain the frypot and dry thoroughly with clean...

Page 14: ...itch is released the drain valve is open When this switch is in the POWER position this indicator will be lit whenever the heating elements are engergized NOTE The Fryer Reset switch and Boil Out swit...

Page 15: ...generally be cooked at a lower temperature than large loads 4 When the fryer is not in use the temperature should be reduced to prolong the life of the oil or shortening It is good practice to experim...

Page 16: ...sing a Frymaster filter cone holder be sure that the cone holder rests securely on the metal container 3 Open the drain valve slowly to avoid splattering If the drain valve becomes clogged with food p...

Page 17: ...ve 3 Clean inside the fryer cabinet with a dry clean cloth to remove dust and any large debris Wipe all accessible metal surfaces and components with a cloth dampened with a solution of detergent and...

Page 18: ...FRYERS EQUIPPED WITH A FILTER SYSTEM MUST BE EMPTIED INTO A FIREPROOF CONTAINER AT THE END OF FRYING OPERATIONS EACH DAY SOME FOOD PARTICLES CAN SPONTANEOUSLY COMBUST IF LEFT SOAKING IN CERTAIN SHORT...

Page 19: ...NOT use other types of filter powder 6 Hang the crumb pan over the front edge of the filter pan ensuring that it is centered left to right in the pan Ensure crumb pan is centered left to right on fro...

Page 20: ...il or shortening prior to filtering NOTE Always wear proper protective clothing when working with hot oil 2 Pull the filter pan out from fryer cabinet and remove the lid crumb pan and leaf filter asse...

Page 21: ...or 9 Close the fryer drain valve The frypot will begin to fill with filtered oil 10 Allow the filter pump to run for approximately 10 15 seconds after large bubbles appear in the frypot see photo belo...

Page 22: ...on the handles at the corner of the assembly and pull outward in opposite directions to separate the frame at the corner Continue to open the frame it will pivot at the opposite corner until the oute...

Page 23: ...ert the screens into one of the frame halves it doesn t matter which one Ensure that the hole in the top screen is on the same side of the frame as the handle 3 Slip the grid between the screens so th...

Page 24: ...Pump starts and abruptly stops y Reset thermal overload y Verify wiring harness is properly connected a damaged harness should be replaced by an FASC y Pump is blocked Call FASC for service y Filter...

Page 25: ...5 1 FLATBOTTOM SERIES ELECTRIC FRYERS CHAPTER 5 WIRING DIAGRAM AND COMMON REPAIR PARTS LIST 5 1 Wiring Diagram Optional...

Page 26: ...5 2 5 2 Common Repair Parts 1 2 4 5 6 7 8 9 10 11 12 13 16 14 15 3...

Page 27: ...l Boil Out Relay 7 807 3722 Interface Board 208 230V Thermatron Board 8 106 0802 Faceplate Assembly Solid State Thermatron Controller 816 0534 Knob Thermatron Controller 106 0801 Potentiometer Assembl...

Page 28: ...5 4 2 6 7 8 9 10 1 3 4 5...

Page 29: ...4 810 2173 Quick Disconnect inch Female 5 106 1831 Quick Disconnect Assembly inch Female 6 823 3492 Lid Filter Pan 7 823 3509 Pan Crumb 8 810 2237 Filter Assembly Magnasol Leaf 9 823 3480 Pan Assembl...

Page 30: ...veport Louisiana 71135 1000 Shipping Address 8700 Line Avenue Shreveport Louisiana 71106 TEL 1 318 865 1711 FAX Parts 1 318 219 7140 Tech Support 1 318 219 7135 Price 6 00 PRINTED IN THE UNITED STATES...

Reviews: