2
1.Measure the ground with spirit level to make sure
ground is in level. Put the wall profiles (6D1) against the
wall, ensuring the distance between the profile and the
wall is correct. Adjust the profile to make sure it is
vertical by using a spirit level. Mark the holes on the
wall.
2.Drill the holes ((
∮
6mm) according to the marks and
insert the wall plugs(6D9) into the holes
3. Insert fixing part 6D8 into rail profiles 6D4. Put rail
profiles on the top and bottom of fixing panel 6D2.
4. Fasten rail profile and vertical profile together with
screw 6D7.