11
Looking underneath the Rack, place the
Floodlight Unit over the side of the Rack
(Hella Plugs facing down). Line up the slots
in the Floodlight Unit with the holes in the
side of the Rack (One either side of the
chosen slat). Secure the Floodlight Unit to
the Rack using two M8 x 20 Button Head
Bolts, four M8 Flat Washers and two Nyloc
Nuts (Items 8, 9 & 10) supplied.
Side Mounting Inline with a Slat
(
)
A
REV_A03
(
)
B
(
C
)
Working from the top of the Rack, slide the two
M8 Nyloc Nuts from Step 4A underneath the
Floodlight Unit, lining the nuts up with the
mounting slots either end of the Floodlight Unit.
Secure the top of the Floodlight Unit to the Rack
using two M8 x 20 Button Head Bolts and two
Flat Washers (Items 8 & 9) and the Nyloc Nuts.
Congratulations, you have completed your
installation. Take a step back and admire
your work. Good Job!
Decide on which side of the Rack you would like to install the Floodlight Unit.
On the chosen side, slide two M8 Nyloc Nuts (Item 10) dome side down into the U-channel through the gap
in the corner of the Tray as shown. Slide the two Nyloc Nuts down the U-channel and into position either
side of the chosen slat as shown.
Chosen Slat
Nyloc Nut
Nyloc Nut