Connecting the
wires to the Ter-
minals
Connecting the
Rapid Shutdown
Box to an Inverter
Connection to the Inverter:
If the AC supply to the inverter is interrupted, the inverter disconnects the PV DC supply
via the Rapid Shutdown Box. As soon as the AC supply is reinstated, the DC supply will
resume.
The signal relay in the Fronius inverter is designed to open when the inverter loses AC
power signaling the Rapid Shutdown Box to disconnect.
However, the signal relay can-
not be used for further functions (Energy Manager, alarm, etc.)
, if the Rapid Shutdown
is to be initialized by means of an AC failure.
The inverter doesn‘t have to be configured after the installation of the Rapid Shutdown Box.
If changes were made in the section energy management, check this section in the invert-
ers user manual. The energy manager (Relay Mode) must be set ‚ON‘ (default value).
A1
A2
DC-Output
Duo / Quattro
Quattro
Signal Port
Duo / Quattro
Duo
Summary of Contents for Rapid Shutdown Box-Duo
Page 2: ...2 ...
Page 4: ...4 ...
Page 12: ...12 3 4 Fasteners not included 5 3 4 5 ...
Page 22: ...22 ...
Page 30: ...30 3 4 No se incluyen los sujetadores 5 3 4 5 ...
Page 40: ...40 ...
Page 49: ...49 FR 3 4 Matériel de fixation non inclus 5 3 4 5 ...
Page 58: ...58 ...
Page 59: ...59 FR ...