Installation | 6
M1820921_en | Installation instructions Dual fuel boiler SP Dual compact
69
Power supply:
Netz
Netz
r
Connect the power supply for the pellet unit to the terminal block of the firewood boiler
NOTICE! Compliance with additional information in the relevant boiler controller
documentation is mandatory!
6.10.4 Potential equalisation
r
The potential equalisation on the boiler base must comply with current directives,
regulations and standards.