Installation | 6
M1820921_en | Installation instructions Dual fuel boiler SP Dual compact
57
r
Unwind the cable of the suction turbine and feed it through the opening of the housing
underside
r
Remove the protective cap on the underside of the suction module
r
Lay the return air line from the suction point to the suction module and fix it to the
pressure side (position 1) with a hose clamp
r
Fix the second part of the return-air line to the under-pressure side (position 2) with a
hose clamp and lay the line to the boiler
NOTICE! When connecting the lines, pay attention to equipotential bonding,
Ü
"Assembly information for hose lines" [
59]