18
MATERIALS NEEDED
Pipe Thread
Sealant
Primer and
PVC Cement
OFF-LINE KIT
Included with the
POOL FROG
®
Cycler
Two Male
Adapters
Two Reducer
Bushings
Two 90 Degree
Elbows
Four Hose
Clamps
6’ of Tubing
Two
Scoops
Two Scoop
Gaskets
Two Scoop Clamps
4 0 0 S E R I E S
W a t e r
C Y C L E R
M e t e r e d P
o o l P u r i f i e r
D e l i v e r y
S Y S T E M
Off-Line Installation - 5430 Model
TOOLS NEEDED
Screwdriver
Pipe Wrench
Battery
Operated Drill
with 5/8” or 19/32” Bit
When insufficient room for an in-line application,
install off-line in straight pipe with scoops between
2” - 36” apart.
Do NOT install an off-line POOL
FROG
®
Cycler in-line as this
POOL FROG
®
Cycler is different
than an in-line unit.
Screw a male adapter into
each port of POOL FROG
®
Cycler and hand tighten.
Completely
tighten
turning 1 to 2
revolutions
with a wrench.
DO NOT OVER TIGHTEN.
1.
2.
3.
4.
5.
OR
Bi-flow valve design allows installation in either flow direction.
•
Install after all equipment and
as far as possible from heater.
•
Any additional sanitizing
equipment that is installed
with FROG
®
must be installed
after FROG
®
(never before)
on the return line to the pool.
SCOOPS
2” – 36” APART
®
BRAND
Following pipe thread sealant
directions, brush sealant
onto POOL FROG
®
threads in
both ports and on both male
adapters.
DO NOT USE PIPE THREAD
TAPE as the threads
on these units are
not suitable for
this use and
leaking or fitting
failure could result.
Following Primer directions,
brush Primer on reducer
bushings and inside of male
adapters. Repeat this process
with PVC cement following
directions on that product.
Insert reducer bushing into
male adapter on both sides
with a twisting action. Hold in
place 5 to 10 seconds to bond.
Following pipe thread sealant
directions, brush sealant onto
elbow threads.
Primer
Primer
PVC
Cement
PVC
Cement
g
s