Parts list: 

closure body, bottom half-shell with 

 

the cable tray and the strain relief 

 

already installed 

closure body, top half-shell 

Plug 

Folding Screw 

slotted white plastic washer 

long circumferential seal 

short circumferential seal 

cable tie 4 x 100 mm, 4 x 200 mm 

container with lubricant 

cleaning tissue 

dry 

14 

screw M5 x 25mm stainless steel/Niro 

14 

M5 washer stainless steel/Niro 

wrench 

installation manual 

 
This installation requires additionally 
a standard 8 mm wrench for the M5 screws. 
 
Prerequisite: General experience with 
FO cable closure installation required! 
 
“Cable” means both: FO cable and FO pipes. 

 
    Plug type 1: 
 

 

    longitudinal slot 

 

 

    core 

 

 

    first ring 

 

 

    second ring 

 

 

    third ring 

 

 

    fourth ring 

 

 

    setback surface 

 
 

Special instructions to make this closure watertight: 

1.) When tearing off the rings from this Plug, it is important, that they are removed 
    complete and without flashes left behind. 
2.) Remove just as many rings as needed so that the Plug fits very tight around the cable. 
3.) Lubricate all parts as required. Lubricate well. Rather lubricate too much than too less. 
4.) Try to not lubricate the threat of the Folding Screw and the thread of the closure body. 
5.) Always when fastening plastic, it might yield a bit over time. Therefor it is required that 
    1 hour (more time is even better) after the installation, the steps 27 and 30 are repeated. 
 
 

Installation Instructions:

 

1.) Installation should be performed only by personnel experienced with FO cable closures. 
2.) It is recommended to start by placing all parts within the top half-shell of the closure body. 
3.) Clean the cable coats. 
4.) Lubricate the cable coat at the position where the Plug will come to be. 
5.) Lubricate the inner surface of the Plug. 

Cable diameter  Work step 
 5.5 -  7.4 mm 

tear out the core 

 7.5 -  9.2 mm 

tear out all of the above and the first ring 

 9.3 – 11.5 mm 

tear out all of the above and the second ring 

11.6 – 14.1 mm 

tear out all of the above and the third ring 

14.2 – 17.5 mm 

tear out all of the above and the fourth ring 