Start-up and fault finding

N.B. 

Be careful when working in the ERP. All internal components
including the cooling flange are at line voltage potential.
Never leave the unit under power without the front cover on.

1. Check that all wiring is correct and that the sensor selector

switches are in the correct position.

2. Measure the resistance between terminals 3 and 4:

At 230V: 14.4

Ω

<R<230

Ω

.  At 400V: 25

Ω

<R<400

Ω

.

3. Connect supply voltage and turn the setpoint knob to the

maximum value. The LED in the side of the ERP should be
continuously on or pulse on/off with longer and longer ontime
and eventually be continuously on.Turn the setpoint to the
minimum value. The LED in the side of the ERPshould be
continuously off or pulse on/off with longer and longer offtime
and eventually be continuously off. At a certain position (within
the proportional band) the LED will pulse On-Off as the ERP
pulses current to the heater The pulse cycle period is approx. 60
seconds. Check with a clamp-on ammeter that current is flowing
to the heater.

Something wrong?

4. Remove wiring to external sensor. The sensor resistance varies

between 10k

Ω

 and 15k

Ω

 between the upper and lower ends of the

sensor temperature range. The resistance changes by 167

Ω

/°C.

5. Set both the sensor selector switches in the downwards position

but leave the sensor inputs G-G open. Switch the voltage on.
ERP should give full uninterrupted power and the LED should be
lit. Check with a clamp-on ammeter that current is flowing to the
heater.
If the LED is not lit and no current is flowing: Check that you have
power on terminals 1 and 2 and recheck the positions of the
sensor selector switches. If OK the ERP is probably faulty.
If the LED lights up but no current is flowing: Recheck the heater
resistance as above. If OK the ERP is probably faulty.

Tel: +46 31-336 86 00
Fax: +46 31-26 28 60
[email protected]
www.frico.se

Frico AB

Box 102
SE-433 22 Partille
Sweden

EMC emissions & immunity standards:

This product conforms with the requirements of
European EMC standards CENELEC EN 50081-1 and EN 50082-
1 and carries the CE mark.

LVD

This product conforms with the requirements of
European LVD standards IEC 669-1 and IEC 669-2-1.

6. Shut off power and short-circuit the sensor input G-G but leave

the switches in the downwards position. Switch on power
again.
ERP should not give out any power at all and the LED should
be extinguished. Check with a clamp-on ammeter that no
current is flowing to the heater.
If the LED is extinguished but current is flowing to the heater
the ERP is faulty.
If the LED is lit, recheck the shorting of terminals G-G. If OK
the ERP is faulty.

7. If everything OK this far the ERP and the sensor/setpoint are

OK.
Shut off power, remove the wire strap from G-G and reconnect
external sensor/setpoint if any. Set the sensor selector
switches in their correct positions according to the appropriate
wiring diagram for the installation at hand. Replace front cover
and setpoint knob. Connect power.

Code

Connection timer

ERPU

Frame for connection timer

ERPR

Slave controlled

electric heating regulator

ERPS

Floor/duct sensor

ERPGG

Room sensor

ERPRG

Accessoires

153

93

40

Summary of Contents for ERP

Page 1: ...k ERP är nollgenomgångsstyrd för att eliminera radiostörningar ERP anpassar automatiskt reglermetod efter reglerobjektets dynamik Vid snabba förlopp t ex tilluftreglering kommer ERP att arbeta som PI regulator med ett fast P band på 20K och en fast I tid på 6 minuter Vid långsamma förlopp t ex rumsreglering kommer ERP att arbeta som P regulator med ett fast P band på 1 5K Elinstallation Installati...

Page 2: ...et finns spänning fram till plintarna 1 och 2 och kontrollera givaromkopplarnas läge igen Om OK är det troligtvis fel i ERP Om lysdioden är tänd men ingen ström går ut Kontrollmät elbatteriets resistans enligt ovan Om OK är det troligtvis fel i ERP 6 Slå av matningsspänningen och kortslut mellan givaringånga rna G G men lämna givaromkopplarna i samma läge som tidigare Slå på matningsspänningen ige...

Page 3: ...her built in sensor or external sensor ERP pulses the whole load On Off The ratio between On time and Off time is varied 0 100 to suit the prevailing heat demand The current is always switched at zero phase angle to prevent RFI ERP is only intended for electric heating control The control principle makes it unsuitable for motor or lighting control N B ERP cannot control 3 phase loads as one phase ...

Page 4: ...eter that current is flowing to the heater If the LED is not lit and no current is flowing Check that you have power on terminals 1 and 2 and recheck the positions of the sensor selector switches If OK the ERP is probably faulty If the LED lights up but no current is flowing Recheck the heater resistance as above If OK the ERP is probably faulty Tel 46 31 336 86 00 Fax 46 31 26 28 60 mailbox frico...

Page 5: ...und prüfen Sie das Ergebnis Korrigieren Sie bei Bedarf die Einstellung Tel 46 31 336 86 00 Fax 46 31 26 28 60 mailbox frico se www frico se Frico AB Box 102 SE 433 22 Partille Schweden G G G G K 1 2 U 3 4 U K G G ERPGG ERPRG Abb 1 Anschluß der Versorgungs spannung und Belastung Abb 2 Umschaltereinstellung bei internem Fühler Abb 3 Umschalter und Anschluß an externem Fühler und internem Sollwert K ...

Page 6: ...und 2 anliegt und erneut die Stellung der Fühlerumschalter prüfen Sind diese einwandfrei liegt die Störung wahrscheinlich im ERP Wenn die Leuchtdiode leuchtet aber kein Strom fließt Batteriewiderstand wie oben messen Ist kein Fehler festzustellen liegt die Störung wahrscheinlich im ERP ERP NOV 98 Tel 46 31 336 86 00 Fax 46 31 26 28 60 mailbox frico se www frico se Frico AB Box 102 SE 433 22 Partil...

Page 7: ...et le temps d arrêt La periode de pulsations est fixée à 60 secondes Le ERP ajuste son mode de régulation Pour des changement de température rapide le ERP agit comme un régulateur Proportionnel Intégral PI avec une band proportionnelle de 20K et un temps de reset de 6 minutes Pour des changements de température lente le ERP agit comme un régulateur proportionnel avec une bande proportionnelle de 1...

Page 8: ...ièmement les switchs de sélection de sonde vers le bas puis ouvrer le circuit des entrées de sonde G G Mettre en route Le ERP devrait donné la pleine puissance sans interruption et la LED devrait être allumée Vérifier avec un multimètre que la batterie est bien alimentée Si la LED n est pas allumée et qu il n y a pas de courant à la batterie vérifier que les bornes 1 et 2 sont bien alimentée et vé...

Page 9: ...ta RFI häiriöiltä vältytään ERP muuttaa säätötapaa automaattisesti lämmittimen dynamiikan mukaan Nopeissa lämpötilanmuutoksissa ERP toimii kuten PI säädin jonka suhteellinen alue on 20 K ja integrointiaika 6 min Hitaissa lämpötilanmuutoksissa ERP toimii kuten P säädin jonka suhteellinen alue on 1 5 K Kytkentä Asennuksen saa suorittaa vain riittävän pätevyyden omaava henkilö Jännitesyöttö fig 1 Lii...

Page 10: ...Jos LED ei pala eikä virta kulje lämmittimelle tarkasta jännitesyötön kytkentä liittimille 1 ja 2 ja tarkasta DIP kytkimien asento Jos nämä ovat kunnossa on ERP todennäköisesti viallinen Jos LED palaa mutta tehonsyöttö ei toimi tarkasta lämmittimen vastus Jos se on kunnossa on ERP todennäköisesti viallinen 6 Kytke jännite pois ja kytke hyppylanka liittimien G G välille mutta jätä DIP kytkimet ala ...

Page 11: ...исимости от текущих потребностей в мощности Включение выключение происходит в нулевой точке синусоиды напряжения с тем чтобы избежать возникновения электропомех ERP предназначен только для управления электрообогревом Принципы триакового регулирования делают невозможным управление двигателями или осветительными приборами ERP не может быть использован для непосредственного управления трехфазных нагр...

Page 12: ... оставьте свободными Подключите питание Нагрузка должна подключиться о чем сигнализирует включение зеленой лампочки индикатора Если лампочка не загорается а нагрузка не потребляет энергию проверьте напряжение на клеммах 1 2 Отсутствие напряжения говорит о возможной неисправности прибора Tel 46 31 336 86 00 Fax 46 31 26 28 60 mailbox frico se www frico se Frico AB Box 102 SE 433 22 Partille Sweden ...

Reviews: