
Installation Steps
Schematic view of the My-Hite wiring:
Step»13:
Insert the
F
control box
in-between crossbeams.
F
CONTROL»
BOX
H
CONNECTOR
WIRES
Step»14:
Connect
E
control panel to
F
control box
with
H
connector wires. Use
L
wire manager
to secure
H
connector wires to underside of
worksurface.
Make»sure»the»length»of»the»plug-in»cord»is»appropriate»to»both»reach»
the»outlet,»AND»for»the»distance»the»table»will»travel»up»and»down.»
Range:»24.5”»at»lowest»to»50”»highest.
Step»15:
Install the
G
telescopic cover
plates, leaving exit space for the
electrical power cords, and secure
to worksurface with
M
8 truss head
screws M5*20mm
Insure the length of
exposed power cord
is sufficient.
Step»16:
Turn table right side up, adjust the glides as necessary, and plug the
power cord into a 110v outlet.