![Fresh Water Systems PharMate SQC Series Installation, Operation & Maintenance Manual Download Page 10](http://html1.mh-extra.com/html/fresh-water-systems/pharmate-sqc-series/pharmate-sqc-series_installation-operation-and-maintenance-manual_2331798010.webp)
RO PURIFICATION ASSEMBLY INSTALLATION
1.
Remove RO membrane cartridge from sealed plastic bag.
2.
Remove white plug from fitting at bottom of cartridge by pushing in small grey collet and pulling out plug.
(Refer to Page 14, Figure 9 for more information on tubing removal from fittings)
3.
Remove red plastic protector cap from top of cartridge.
4.
Connect Red SFC Flow Control tubing by inserting end into fitting at bottom of RO membrane.
(
Note tag attached to Red SFC Flow Control tube which indicates outlet end)
NOTE: DO NOT alter length of Red SFC Flow Control tubing.
Factory set length is critical for proper functioning of system flow rate.
5.
Insert cartridge and push into manifold port until fully seated. Line up cartridge ears (Page 16, Figure 10).
Twist cartridge 1/4 turn counter-clockwise to lock into place. Once positioned, cartridge should be oriented so
label faces towards front and SFC flow control fitting is located towards rear.
6.
Reconnect loose end of 3/8” yellow tubing (originating from tank) to Tank Elbow on backside of RO purification
assembly.
7.
Wall mount RO purification assembly using two #10 x 3/4” screws provided, preferably on right side cabinet wall.
Mount at least 2” above cabinet floor to allow for future filter changes.
8.
Place storage tank in rear area of cabinet either vertically or horizontally.
Note:
For horizontal positioning, carefully detach tank stand from base of tank and use as tank cradle.
11