Installation Overview
Installing the FreeWire Boost Charger requires three people and takes approximately two hours. The
following steps are required for installation:
Step 1
Schedule commissioning a week prior to installation. Please reference the section titled
‘Commissioning the Boost Charger’ in section 2.
Step 2
Confirm that the site is ready per the Boost Charger Site Preparation Guide, and all required
equipment and tools are available.
Step 3
Install the FreeWire Boost Charger as described in section 2.
Step 4
Power on and activate the FreeWire Boost Charger as described in section 2.
Note:
Always check local codes and requirements to ensure that the installation is compliant.
Concrete Pad Installation
The FreeWire Boost Charger must be installed on a concrete pad. Details can be found in the FreeWire Boost
Charger Site Preparation Guide (Part Number 770-00004-01). Before proceeding, make sure the conduit is
plumb and the concrete pad is properly prepared, free of debris, level, and cured.
Note:
Ensure that the concrete pad is level. If not, be sure to use the proper concrete grinding tools
to remove any bumps in the concrete.
Concrete Pad
Mounting Bolts with
Protective Caps (x8)
Signal / Remote
Shut off Conduit
Main Electrical
Conduit