background image

PNP Assembly Instructions

6

After installed the plane, before flying, we need a fully charged battery and connect to the ESC, then use radio to test

and check that every control surface work properly.

Aileron

Stick Left

Stick Right

Stick Left

Stick Right

Rudder

Elevator

Stick down

Stick Up

F-35  Lightning II  

ltem No : FJ216-V01

Control Direction Test

Summary of Contents for F-35 Lightning II Joint Strike Fighter

Page 1: ...Wingspan 820mm Length 1210mm Empty Weight 1700G w o Battery F 35Lightning II Joint Strike Fighter FREEWING 1 13 SCALE 70MM EDF JET EN 1 8 中 9 16 ...

Page 2: ...stall Main wing Install Horizontal Stabilizer Install Scale Accessories Battery Pushrod instructions Center of Gravity Control Direction Test Dual Rates and Flight Attention Servo Direction Motor Specification Introduction Basic Product information Packing list PNP Assembly Instructions 6 7 1 8 8 2 2 3 3 4 5 4 5 3 前言 产品基本参数 产品包装清单 PNP组装说明 ...

Page 3: ...is in the low position and transmitter switch on then it can connect the lipo battery in aircraft 12 Do not try to take planes by hand when flying or slow landing process You must wait for landing stop then carry it 1 F 35 Lightning II Thank you for purchasing our Freewing 70 mm EDF Super Scale Jet the F 35 Lightning II It is 1210mm in length with a wingspan of 820mm This 1 13 scale F35 uses EPO m...

Page 4: ...63 in 820mm 32 28 in EN 1 2 3 4 5 6 7 8 9 10 Carbon tube Pushrod instructions Non slip mat Glue Manual Screw PNP ARF Plus Airframe No N ame PN P ARF Plus Airframe No Name Fuselage Main wi ng Horizontal tail Vertical tail Drop tank Pre installed all elec tronic parts Pre installed all elec tronic parts Pre installed servo Pre installed servo No elec tr onic equipment Pre installed all elec tronic p...

Page 5: ...all the left right vertical stabilizer 2 Use 4pcs screws to fix the vertical stabilizer As the photo show 1 Insert the carbon tube to two side of fuselage and connect the wing servo cable with fuselage extension wire 2 Install left right main wing and use screws to fix As the photo show 1 Insert the transfer plastic parts of left right horizontal stabilizer to the tail of fuselage 2 Center the ele...

Page 6: ...Use rubberized non slip tape or hook and loop tape Battery cabin size Before connecting the battery and receiver please switch on the transmitter power and make sure the throttle stick is in the lowest position Bind your receiver to your transmitter according to your transmitter s instruction manual Magnet Nose Cone Install Nose Cone As the photo show Use elevator pushrod to connect the servo arm ...

Page 7: ...o a suitable location you can also install a counterweight to achieve correct CG However with the recommended battery size a counterweight is not required We recommend flying without unnecessary counterweight Nose gear steering pushrod Iength Nose gear steering pushrod mounting hole Pushrod diameter Aileron pushrod Iength Aileron pushrod mounting hole Elevator pushrod Iength Elevator pushrod mount...

Page 8: ...eed a fully charged battery and connect to the ESC then use radio to test and check that every control surface work properly Aileron Stick Left Stick Right Stick Left Stick Right Rudder Elevator Stick down Stick Up F 35 Lightning II ltem No FJ216 V01 Control Direction Test ...

Page 9: ...tter We recommend using High Rate for the first flight and switching to Low Rate if you desire a lower sensitivity On successive flights adjust the Rates and Expo to suit your preference Aileron Flaps Rudder Low Rate High Rate Aileron measured closest to the fuselage Rudder Measured from the bottom D R Rate D R Rate D R Rate D R Rate H1 H2 13mm 13mm 80 H1 H2 15mm 15mm 100 D R Rate D R Rate 4mm F 3...

Page 10: ...teering servo Aileron R Aileron L Elevator R Elevator L Rudder R Rudder L 9g Digital MG 9g Digital MG 9g Digital MG 9g Digital MG 9g Digital MG 9g Digital MG 9g Digital MG Positive Positive Positive Positive Positive Positive Positive 2210KV 2957 2210KV 70 2600 80 240 1550 1 68 22 2 6S E72311 2957 2210KV Item N o Thrust g Current A Use voltage V U se ESC A EDF Weight g Max power W Efficiency g w M...

Page 11: ...废处理的模型飞机电池 应妥善回收处理 不准随意抛弃 避免自燃而引发火灾 10 在飞场飞行时 应做到妥善处理飞行后所产生的垃圾 不可随意抛弃 焚毁模型及其配件 11 在任何情况下 都必须保证油门杆处于起始位 发射机处于打开状态时 才能连接模型飞机内部的动力电池 12 无论是模型飞机是在正常飞行过程中 或者是在缓慢降落过程中 都不要尝试用手去回收模型 必须等模型降落停 稳以后 再进行回收 9 F 35 Lightning II 欢迎购买飞翼模型 2019 款 F 35A 电动涵道模型飞机 此模型机长 1210mm 翼展 820mm 近似 1 13 比例 主要采用 EPO 材料制作 外形轮廓仿真 细节丰富 在机体表面拥 有大量的刻线 并完成喷涂上色 配合贴纸及塑料仿真配件 几乎还原了真机表面效果 具有极 高的视觉观赏性 全机各翼面 均采用快拆结构 大量碳纤管的植入 能够有效提高结构强度 保证飞行...

Page 12: ... 子 设 备 不 含 电 子 设 备 1210mm 47 63 in 820mm 32 28 in 翼载荷 163g dm2 翼面积 14dm2 舵机 9g数码金属 7pcs 电机 2957 2210KV内转无刷电机 涵道风扇 70mm 12叶一体涵道 电调 80A无刷电调 UBEC 5A 起飞重量 1700g 不含电池 推力 2600g 机体材料 EPO ABS工程塑料 副翼 有 襟翼 有 平尾 有 垂尾 有 起落架 金属减震起落架 飞行员 仿真飞行员 1pcs 电池范围 锂电池 6S 3500 4500mAh 1pcs 标 准 版 注意 此处各项参数 均使用本公司配件测试得出 如果使用副厂配件 会有所差异 使用副厂配件时所产生的问题 我们将无法给予技术支持 打开产品包装 核对包装清单 不同配置的版本 包含内容不同 其 它 特 性 10 F 35 Lightning II ltem No...

Page 13: ... 翼 组 装 平 尾 组 装 11 如图所示 1 将碳纤管插入机身两侧 把主翼舵机线与机身延长线连接 2 把左 右主翼安装好后 用螺丝把主翼固定 A 平尾 B 转接塑料件 C 螺丝 A 碳纤管 B 主翼舵机线 C 螺丝 PWA3x8mm 4pcs 垂 尾 组 装 如图所示 1 将垂尾舵机线与机身延长线连接后 把左 右垂尾安装好 2 使用4颗螺丝固定住垂尾 防止松脱 A 垂尾 B 垂尾舵机线 C 螺丝 FA3x8mm 4pcs 步骤1 步骤1 步骤2 A A B C B C A B 步骤2 C F 35 Lightning II ltem No FJ216 V01 ...

Page 14: ... C 舵机摇臂 机头罩 2pcs 电 池 安 装 说 明 将电池与电调间接前 首先请打开发射机电源 确 认油门杆处于低位 我们建议使用的电池容量和放电倍率如下 锂电池6S22 2V 3500mAh 6S22 2V 4500mAh 放电倍率 30C 电池 电池舱盖 扎带 电池舱尺寸 L 270mm W 75mm H 50mm 电池安装好后 用魔术带扎紧 机 头 罩 安 装 12 A B C 磁吸附 插销向后推 打开座舱 F 35 Lightning II ltem No FJ216 V01 ...

Page 15: ...重心标示图 来调整飞机的重心 重 心 示 意 图 4mm 您可以将电池向前 或者向后移动 来调整飞机的重心 如果通过电池的移动无法调整到正确的重心位置 您还可以适当 的使用一些其它材料来配重 使飞机的重心处于正确的位置 13 F 35 Lightning II 钢丝直径 Ø1 2mm 钢丝直径 Ø1 2mm 钢丝直径 Ø1 2mm 前轮转向控制钢丝尺寸 前轮转向控制钢丝安装孔位 65 mm 15 27 16 41 5mm 4 15 16 1 2 3 4 78 mm 4 15 16 1 2 3 4 2 3 4 钢丝直径 Ø1 2mm 1 2 3 55mm 2 1 4 ltem No FJ216 V01 ...

Page 16: ...升降摇杆 向上运动 升降摇杆 向下运动 方向舵 副 翼 副翼摇杆 向左运动 方向摇杆 向左运动 方向摇杆 向右运动 升降舵 中文版 PNP 组装说明 14 当您按前面的步骤组装好飞机后 在飞机前 我们需要一块充满电的电池 连接到电调 用 遥控器测试每个舵面的工作情况 检查是否正常 舵 面 测 试 副翼摇杆 向右运动 F 35 Lightning II ltem No FJ216 V01 ...

Page 17: ...议初次飞行使用大舵量起飞 然后根据个人情况调整到适合 您的舵量 大 大 小 舵 参 数 副 翼 升 降 舵 H1 H2 H1 H2 副翼 内侧 升降舵 内端 H1 H2 14mm 14mm 60 舵量比率 舵量比率 舵量比率 舵量比率 H1 H2 21mm 21mm 80 小舵量 大舵量 H1 H2 18mm 18mm 80 H1 H2 25mm 25mm 100 方向舵 下端 舵量比率 舵量比率 H1 H2 13mm 13mm 80 H1 H2 15mm 15mm 100 方 向 舵 H1 H2 4mm F 35 Lightning II ltem No FJ216 V01 ...

Page 18: ... 机 使 用 介 绍 1 2 3 4 5 7 6 如果您需要选购其它品牌的舵机进行安装 请参考下面的表格选择的舵机 舵 机 位 置 舵 机 规 格 舵 机 线 长 正 反 向 正 向 正 向 正 向 正 向 正 向 正 向 正 向 序 号 1 100mm 100mm 100mm 100mm 100mm 100mm 100mm 前轮转向 9g数码 金属 9g数码 金属 9g数码 金属 9g数码 金属 9g数码 金属 9g数码 金属 9g数码 金属 副翼 左 副翼 右 平尾 左 平尾 右 垂尾 左 垂尾 右 2 3 4 5 6 7 Item No MI036582 动 力 组 编 号 使 用 电 机 使 用 电 压 V 使 用 电 调 A 涵 道 重 量 g 最 大 功 率 W 效 率 比 g w 电 机 K V 推 力 g 电 流 A F 35 Lightning II ltem No FJ...

Page 19: ...R RC com ...

Reviews: