41
Installation
battery chargers, should be connected to the Main AC Panel.
Power for these loads are supplied by shore or generator
power that is connected to the main panel.
This split load approach will help avoid problems such as
overloading the inverter or rapidly discharging the battery
bank. It also eliminates the need to manually manage your
energy usage when using inverter power.