background image

 

         

 1 

L Shaped Tube          8 1/4 in x 47 1/4 in (21 cm x 120 cm) 

 

 

 

 

          one end perforated

 2 

Straight Tube             53 in (134.6 cm)         

 

 

 

 

 

 

 

 

          metal snaps on both tapered ends

 3 

Straight Tube             36 7/8 in (93.7 cm)           

 

 

 

 

 

 

 

          metal snaps on both tapered ends

 4 

Straight Tube            48 in (1.22 m)     

 

 

 

 

 

 

 

 

          metal snaps on both tapered ends

 5 

L Shaped Tube          8 1/4 in x 31 1/2 in (21 cm x 80 cm)   

    

 

 

 

 

 

          both ends perforted

 6 

2  

J Shaped Tube           12 1/2 in x 22 5/8 in (30.5 cm x 57.5 cm) 

 7 

Straight Tube            35 1/2 in (90.2 cm)   

 

 

 

 

 

 

 

 

          metal snaps on both tapered ends

 8 

Bent Tube 

          22 7/8 in (58.1 cm)

 9 

Mesh Net 

          24 ft x 8 ft x 4 in 

 

 

 

 

          (7.31 m x 2.44 m x 10.2 cm)

10

 

U Shape Ground        8 in (20.3 cm)

 

             Stake 

11

 

40 

Self-Stick Closure      8 in x 3/4 in (20.3 cm x 1.91 cm)

  Strips 

 

12

 

8  

Hardware Set             metal: screw/washer/wing nut

FIGURE 2B

1

RED TAB

RED TAB

BLUE TAB

BLUE TAB

2

3

4

5

6

7

8

9

10

11

12

1

2

3

5

6

7

8

2

4

1

1

3

6

7

8

1

5

4

FIGURE 2A

Figure #2 

FRAME ASSEMBLY

Assemble all lengths of tubing shown in Figure 1. Be sure that each piece 
is inserted completely.  The ends of each tube insert tightly and is secured 
when the press button of the tapered end pops through the adjoining 
perforated tube.(Figure 2A)

Figure #1     FRAME COMPONENTS

Step  Assembly Instructions

1. 

Assemble the first set of tubes, parts  1  &  2 . This will create the 

 

back base.

2. 

Insert tapered tubes, part  4  , to the back base. The end with the 

 

two holes needs to be attached closest to the back. 

3. 

Insert L shaped tubes, part  5  , as shown into the side base section

 

of tubes part(s).

4. 

Insert tapered tubes, part  3  , into the upward reaching base. The 

 

end with the two holes needs to be at the top.

5. 

After assembling the second set of tubes, parts  1  &  2  , place 

 

these on the two tapered sections, part  3  , to complete the frame.

6. 

Assemble the two reinforcement sections by connecting parts 

 

6  ,  7  , &  8  . The J shaped section, part  6  , is the upper section

 

while the bent tube numbered  8  attaches to the base.

7. 

Align the  2  holes from J tube with the two holes in tube  3  . Using

 

one set of hardware, insert the screws through the two sets of 

 

tubes from the front. When the screw passes through the two tubes

 

place the washer on the screw then add the butterfly. Turn the 

 

butterfly clockwise to tighten. Repeat with the 2nd set of hardware. 

 

(Figure 2B)

8. 

Align the two holes from the bent tube with the two holes in tube  4  . 

  

Using one set of hardware, insert the screws through the two sets of 

 

tubes from the base. When the screw passes through the two tubes

 

place the washer on the screw then add the butterfly. Turn the 

 

butterfly clockwise to tighten and secure the tubes together. Repeat

 

with 2nd set of hardware.

6

3

PART QTY  DESCRIPTION

Reviews: