8
D2
D1
150mm (6")
min
150mm (6")
min
300mm (
12
")
min
150mm (6")
min
150mm (6")
min
D1
D2
D3
• When laying duct onto a concrete base a 150 mm (6") thick bed of compacted sand should be laid on the
concrete, below the duct. (The minimum amount of sand should be 50 mm (2") of compacted sand)
• All beds should be laid so that the pipe will not dip or sag when it is installed.
• Laying of pipe should start from the tank farm.
• Any mechanical joints or compression fittings must be located within a containment chamber or sump or
be adequately protected from the environment when used on buried vent lines.
NOTE:
Refer to FFS manual 408001007 for information about the electrofusion process.
• UPP
®
pipe that is located between dispenser containment or that exceeds 12 m (39 ft) should be laid in a
series of large snake-like curves and not in straight lines. Uncoiled pipe, when laid, will settle in a natural
curve.
• Generally any thermal expansion will be accounted for by following our guidelines for spacing, backfilling
and ensuring runs are “snaked”.
• Pipes should be separated from each other by at least the diameter of the largest pipe.
• If pipe-runs cross, they must be separated by at least as much backfill material as the diameter of the
largest pipe or protected using at least 25 mm (1" ) of expanded polystyrene.
NOTE:
If used above ground, UPP
®
pipe should be protected against mechanical, climatic damage. Additional
supports and anchor points may also be required. Check fire codes for proper installation. Also see the document
"UPP
®
Piping Above Ground and Marina Installations."
• Mark positions on the tank access chamber/sump for penetration locations and install UPP
®
seals.
BEND RADIUS
The UPP
®
piping systems have a semi-rigid construction which gives both strength and flexibility. To achieve
absolute minimum bend radius in cold conditions, use a heated trailer or equivalent to precondition the pipe. In
the drawing below, “X” is the bend radius, the distance between the pipe axis and “+,” the center of the pipe's
arc.