11
7.
Rotate the display down, and press in the latches on the display holder so that they click
into their holes in the barriers.
The 2-pin stacker protrudes through the hole in the display holder. Insert the new grounding
clip that was included in your LCD display kit. This clip has a spring side and a clip side. Use
smooth jaw, needle nose pliers to grasp the clip side of the grounding clip and seat it in
the hole in the display holder where the 2-pin stacker protrudes. The spring side of the clip
should hold the stacker against the display. You may need to push the grounding clip into
the hole to seat it properly.
Install the cover
NOTE
: If you are upgrading your EVO
TM
200 or EVO
TM
400 ATG to have an LCD display, you will
receive a new cover that has an opening for the display. Make sure you install that cover.
IMPORTANT:
In the following step, be careful when you lower the cover onto the ATG in order to
avoid damaging the LED light pipes.
1.
Lower the cover straight onto the ATG so that the LED light pipes are not bent or broken.
Lower the cover until the release tabs click into their holes in the sides of the ATG.
LED light pipes
Cover release tabs
2.
Turn on the circuit breaker for the ATG.
Summary of Contents for EVO 200
Page 1: ...EVOTM 200AND EVOTM 400 LCD DISPLAY INSTALLATION GUIDE ...
Page 4: ......
Page 8: ...4 Intentionally Blank ...
Page 16: ...228180027 r1 ...