background image

Installation and maintenance manual

SediPoint

®

 –   sedimentation  shaft

DRAINAGE SYSTEMS

ELECTRICAL SYSTEMS
BUILDING TECHNOLOGY
INDUSTRIAL PRODUCTS

Last modified: January 2020

Summary of Contents for SediPoint

Page 1: ...Installation and maintenance manual SediPoint sedimentation shaft DRAINAGE SYSTEMS ELECTRICAL SYSTEMS BUILDING TECHNOLOGY INDUSTRIAL PRODUCTS Last modified January 2020...

Page 2: ...Directives for working in tanks and nar row spaces BGR 117 Richtlinien f r Arbeiten in Beh ltern und engen R umen BGR 117 n Standards Excavations and trenches slopes planking and strutting breadths o...

Page 3: ...vating pit and creating bearing 8 4 3 Pre assembling the base shaft 8 4 4 Installing the base shaft 8 4 5 Embedding the pipe 12 4 6 Optional connection set 12 4 7 Tests before backfilling and impermea...

Page 4: ...ional connection set 1 SediPoint 2a Sediment collector with flow separator 2b Immersion pipe 3 Integrated bypass incl backwater threshold 4 Inlet 5 Outlet 6 Mud chamber 7 Operating pipe with telescopi...

Page 5: ...to 2 50 m n BARD ring class D concrete support ring environment and downstream stormwater management structures 2 00 Inlet DN OD 315 Inlet DN OD 200 1 02 1 57 1 49 2 51 3 06 0 34 0 30 Shaft cover 1 CW...

Page 6: ...f spills with light liquids In case of spills in dry weather Floatables and light liquids Coarse particles Fine particles Coarse particles sediment in the mud chamber Fine particles sediment thanks to...

Page 7: ...nd that they are protected from getting dirty The impact strength of the material decreases in sub zero temperatures The relevant safety provisions of the building industry apply Delivery includes Sed...

Page 8: ...ben und Gr ben apply When installing the shaft comply with e g DIN EN 1610 Construction and testing of drains and sewers Einbau und Pr fung von Abwasserleitungen und kan len Create and compact the sha...

Page 9: ...shaft with bayonet nut connector For better accessibility position the handle directly under the mud bucket Adjust the telescopic rod of the operating pipe if required with extension for large shaft...

Page 10: ...secure it to prevent shifting Ensure upright alignment Mount cone with sealing ring on base shaft into the second corrugation trough use lubricant Mount cone with sealing ring on base shaft into the...

Page 11: ...ss D concrete support ring can be used as an alter native to on site concrete support Generally both must be positioned 10 cm over the edge of the shaft or extension pipe Ensure load separation to the...

Page 12: ...s compactable material Compact material layer by layer For structured wall pipe connections mount the sealing rings into the second corrugation trough Use lubricant The extension pipe DN 250 can be cu...

Page 13: ...o avoid sta tionary loads between equalisation ring and shaft cover Create the bearing from compacted bearing layer material EV2 module 100 MN m or in situ concrete of at least C 16 20 Avoid connectio...

Page 14: ...joint between the bearing and extension pipe The bearing surface for the frame must be even The frame of the shaft cover must rest on the bearing with its entire contact area If the cover is outside...

Page 15: ...ecialist Alternatively cleaning can be performed using a high pressure cleaner and a wastewater pump The maximum out side diameter of the pump must not exceed 170 mm For disposal of a Remove the shaft...

Page 16: ...t the same time drain the flushing water To do so clean the depots and flow separators through the cleaning shaft of the sediment collector 1 Insert the operating pipe 2 Close the bayonet nut connecto...

Page 17: ...ning is required the sediment collector can be removed using a winch or tripod When using the optional connection set you can determine the degree of pollution of the inlet through the open cover The...

Page 18: ...ation techniques are applied these must be agreed upon with FR NKISCHE since these situations or techniques may lead to different conclusions Notwithstanding the above the customer is solely responsib...

Page 19: ...chtscheidel fraenkische de International Sales European Sales Technology Dinah Nigrowics 49 9525 88 8155 dinah nigrowics fraenkische de Stefan Wei 49 9525 88 8824 stefan weiss fraenkische de Jennifer...

Page 20: ...00 people worldwide Both our many years of experience and expertise in plastics pro cessing our consulting services and the large array of products are highly valued by our customers FR NKISCHE is a t...

Reviews: