ins
tallation and t
ec
hnical dat
a
Pag
e 13
Technical data for Spectra
Coffee bean hopper
1.2 kg per grinder
(optional: lockable)
Powder dosing unit
1 kg per container
(optional: lockable)
2 x 0.5 kg
(optional double powder dosing unit)
grounds container
80 cakes
(optional: grounds ejection)
Boiler volume
1.1 liters
(coffee boiler)
Hot water or steam 1.1 liters at 3.3 kW
Hot water or steam 1.7 liters at 5.6 kW
Electrical connection
200 - 240 V 1L N PE 2.5 - 3.6 kW 50/60 Hz Fuse: 16 a
200 - 240 V 1L N PE 5.2 - 6.8 kW 50/60 Hz Fuse: 30 a
200 - 240 V 3L PE 5.2 - 6.8 kW 50/60 Hz Fuse: 16 a
200 - 240 V 3L PE 7.0 - 9.2 kW 50/60 Hz Fuse: 16 a
400 V 3L N PE 6.8 kW 50/60 Hz Fuse: 16 a
400 V 3L N PE 9.2 kW 50/60 Hz Fuse: 16 a
Electric cable
l = 1500 mm
Supply line
Metal hose with union nut g3/8", l = 1500 mm (59")
Waste-water hose
d = 16 mm, l = 2000 mm
not permanently attached to the drain (vented)
Noise emission
< 70 dB (a)
Weight
46 kg 55 kg per machine
Cold water connection
g3/8” outside thread
Water pressure
80 - 800 kPa (0.8 - 8.0 bar)
Water shut-off
with check valve and filter
Water hardness
max. 70 mg Cao/1 l water (7 dH, 13 °fH)
Chlorine content
max. 0.1 mg/l World Health organization: max. 0.5 mg/l
ideal pH value
7
Funnel
d = 50 mm (2") with siphon
Drain pipe
dmin = 1"
ambient conditions
Humidity: max. 80 %
ambient temperature: 10 - 35 °C
Preparations
•
The power connection for the coffee machine must be protected
by a ground fault circuit interrupter (gFCi).
•
Each terminal of the power supply must be able to be interrupted
by a switch.
•
The water connection must have a shut-off with a check valve and
filter and must meet the requirements of the technical data.
(only
when being used with a water connection)
•
The water for the preparation of coffee should always be fresh,
oxygenated and rich in minerals.
•
if you own a coffee machine with an electrical connection other
than those described in the table opposite, you will have received
additional information regarding the installation with your order
confirmation.
installation
You must have completed these preparations before one of our serv-
ice technicians can install the coffee machines for you.
one of our service technicians will install your coffee machines and
put them into operation for the first time. The technician will walk you
through the basic functions.
Your Spectra must be properly installed so that you can operate it correctly—one of our service technicians will do
that for you. You'll have to take care of a few things first. You'll find the preparations for problem-free enjoyment of
your coffee machine here
Installation and technical data
Installation