background image

Power Factor Correction         

Operation Manual GMKPc JKL Series Automatic Controllers

 

 

FRANKE GMKP LTD.

   

Http://www.frankegmkp.com

 

Berlin,Frankfurt,Germany 
Tel: 0049 30200033043 
Email:[email protected] 
C1607 Software Park, National Hi-Tech 
Industry Development Area, Wuxi 
Tel: 0086 510 85211911 
Fax: 0086 510 85215070 
Email:[email protected] 

 

Save energy and reduce Carbon Dioxide emission!   

For a better Power ! 

Summary of Contents for GMKPc JKL Series

Page 1: ...tp www frankegmkp com Berlin Frankfurt Germany Tel 0049 30200033043 Email info frankegmkp com C1607 Software Park National Hi Tech Industry Development Area Wuxi Tel 0086 510 85211911 Fax 0086 510 85215070 Email info frankeenergy com Save energy and reduce Carbon Dioxide emission For a better Power ...

Page 2: ...ly Wide applicability The Controller can automatically meet the distribution systems of different parameters while the transformation ratio of current transformer and capacitance of compensation capacitor are not required Over voltage protection Automatically and quickly throw out the thrown in capacitor unit step by step when the voltage of power network exceeds the setting value Low reactive loc...

Page 3: ...P is connected with the contact B when the coil voltage of contactor is 380 V see the diagram at the back The contact P is connected with the contact N when coil voltage is 220 V 4 Parameter setting 4 1 In the setting state automatically return to automatic state if not pressing any key within 20 seconds 4 1 Press key the manual light will turn on Then press key for gradually throwing in and key f...

Page 4: ...oad current is less than 5 of designed rating or no load or input current is open 6 2 After connecting with power supply it is unable to throw in the capacitor but leading or power factor is more than 0 90 and less than 0 30 in the display denoting wrong selection of phase of input current and voltage If so reconnect the wire 6 3 If self test is required the self test F 4 shall be set at 0 Disconn...

Page 5: ... 380V contact P connects with contact B Drilling size 68x68mm for 5 steps and 7 steps 113x113mm for 10 steps and 12 steps Mounting size 72x72mmx213mm for 5 steps and 7 steps 138x138mmx150mm for 10 steps and 12 steps c JKL controllers Connection power factor correction GMKPcJKL Controllers ...

Page 6: ...GMKP is partner of major projects like Olympic projects CCTV EXPO2010 Beijing airport Moreover FRANKE is supplier of many famous foreign brand capacitor manufacturers for their OEM production of capacitors In addition to our capacitor manufacturing FRANKE GMKP ENERGY CONTROL provides a wide range of products for power factor correction PFC and energy management systems such like References FRANKE ...

Reviews: