background image

 

 

 

 

EN 

 

9

 

11

12a

350

X

116

1÷2

116

650 min.

7.2.1

64

INSTALLATION

 

Wall drilling and bracket fixing 

 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Wall marking: 
•  Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the 

centre of the area in which the hood will be installed. 

•   Draw a horizontal line at 650 mm above the hob. 
•  Place bracket 7.2.1 on the wall as shown about 1-2 mm from the ceiling or upper limit align-

ing the centre (notch) with the vertical reference line. 

•  Mark the wall at the centres of the holes in the bracket. 
•  Place bracket 7.2.1 on the wall as shown at X mm below the first bracket (X = height of the 

upper chimney section supplied), aligning the centre (notch) with the vertical line. 

•  Mark the wall at the centres of the holes in the bracket. 
•  Mark a reference point as indicated at 116 mm from the vertical reference line and 350 mm 

above the horizontal reference line. 

•   Repeat this operation on the other side. 
•  Mark a reference point as indicated at 64 mm from the vertical reference line. 
•   Drill ø 8 mm holes at all the centre points marked. 
•   Insert the wall plugs 11 in the holes. 
•  Fix the lower bracket 7.2.1 using the 12a screws (4,2 x 44,4) supplied. 
•  Fix the upper bracket 7.2.1  and the air outlet connection support 7.3  together using the 2 

screws 12a (4,2 x 44,4) supplied. 

•  Insert the 3 screws 12a (4,2 x 44,4) supplied in the hood body fixing holes, leaving a gap of 

5-6 mm between the wall and the head of the screw.

 

 

Summary of Contents for FNES 907 BTH XS/GLASS

Page 1: ...lation Cooker Hood Istruzioni per l uso e l installazione Cappa Mode d emploi et installation Hotte de Cuisine Bedienungsanleitung und Einrichtung Dunstabzugshaube Kullan m ve montaj talimatlar Davlum...

Page 2: ...EN 2 2 Instructions Manual INDEX RECOMMENDATIONS AND SUGGESTIONS 7 CHARACTERISTICS 8 INSTALLATION 9 USE 12 MAINTENANCE 13...

Page 3: ...naked flames under the hood when it is in operation Adjust the flame intensity to direct it onto the bottom of the pan only making sure that it does not engulf the sides Deep fat fryers must be contin...

Page 4: ...2 2 1 Lower Section 9 1 Reducer Flange 150 120 mm 14 1 2 Air Outlet Connection Extension 15 1 Air Outlet Connection Ref Q ty Installation Components 7 2 1 2 Upper Chimney Section Fixing Brackets 7 3...

Page 5: ...per chimney section supplied aligning the centre notch with the vertical line Mark the wall at the centres of the holes in the bracket Mark a reference point as indicated at 116 mm from the vertical r...

Page 6: ...staller To install a 120 mm air exhaust connection insert the re ducer flange 9 on the hood body outlet Fix the pipe in position using sufficient pipe clamps not sup plied Remove any activated charcoa...

Page 7: ...widen the two sides of the upper flue and hook them behind the brackets 7 2 1 making sure that they are well seated Secure the sides to the brackets using the 4 screws 12c 2 9 x 9 5 supplied Make sure...

Page 8: ...he Fans turn off and the carriage returns After this the 24H function starts Starts the Motor at a speed that allows suction of 100 m3 h for 10 minutes per hour for 24h after which the Motor will stop...

Page 9: ...and need to be cleaned whenever the FF sign appears on the display or at least once every 2 months use or more frequently if use is particularly intensive Resetting the alarm signal Turn the Lights a...

Page 10: ...ter saturation alarm DEACTIVATED CHANGING THE ACTIVATED CHARCOAL FILTER Resetting the alarm signal Turn the Lights and the Suction motor off then disable the 24h func tion if enabled Press button E un...

Page 11: ...436004063_ver2 Franke S p a Via Pignolini 2 37019 Peschiera del Garda VR www franke it...

Reviews: