Franke Kaffeemaschinen AG
Installation | 6
User manual S700
23
6
INSTALLATION
6.1
Preparations
– The mains power connection for the coffee machine must be protected by a residual current circuit-breaker
(RCCB).
– Each terminal of the power supply must be able to be interrupted using a switch.
– The mains water connection must meet the
Requirements of the water supply [
state, and local regulations.
– The coffee machine must be connected to the water supply with the supplied hose kit. Do not use any other
water hoses that happen to be present.
– Make sure to provide a stable, ergonomic cup tray (min. load capacity 150 kg). The operator panel should be at
eye level.
You must have completed these preparations before one of our service technicians can install the coffee machine
for you. Your service technician will install your coffee machine and carry out the initial commissioning process. The
technician will walk you through the basic functions.
6.2
Dimensions
All dimensions are specified in mm.
A
A
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
Franke Kaffeemaschinen AG
Franke-Strasse 9
CH-4663 Aarburg
Telefon: +41 62 787 3607
E-Mail: [email protected]
Internet : www.franke.com
These drawings and specifications are the property of
Franke Technology and Trademark Ltd. and shall not be
reproduced, copied or transfered to any third party without
the prior written permission of Franke Technology and
Trademark Ltd., Hergiswil, Switzerland
Unit
mm
Scale
NTS
Drawn
Modified
Checked
ECN
500000001256
Article
Number
Description
FCS4067
PJ047
16.03.2018
PJ047
16.03.2018
SM055
16.03.2018
Status
Revision
Document ID - Version
Sheet / Sheets
Format
20108020-01
A1
1 /1
-
80
75
0
54
0
340
15
5
85
-
1
75
10
0
12
0
16
8
28
8
168
218
50
20
0
600
Printed MS944 on 05.04.2018 16:06:50 80 / Released
S700 – front/side view