Screw in the closed ball valve (d) as far as possible, creating a seal and bringing it
into position as follows:
– The valve axis must point forwards (and not to the wall).
– The pivot motion of the valve lever must be aligned so that it is parallel to the
wall.
10.4
Screw the wall support (e) onto the ball valve (d) to form a seal and align flush with
the wall plate (a).
☞
For a door leaf width from 1 m, check whether the door frame obstructs the
assembly of the pull rod or wall support.
10.5
Door leaf width up to 1 m:
Align the wall panel (a) centrally above the door, 2310 ± 100 mm above the finished
floor in accordance with the water intake, and mark the drill holes.
10.6
Align the wall support (e) in accordance with the dimensions and mark the drill holes.
10.7
Drill in accordance with these markings.
10.8
Insert the wall plugs.
10.9
Screw on the wall plate (a) and the wall support (e).
10.10
Place the wall support (f) onto the guide (h) on the manual actuator and secure with
the grub screw (g).
10.11
Place the valve lever into the "close" position.
A: Closed
B: Open
10.12
Screw the manual actuator (k) into the fork head (j) of the deflection lever and lock
with a nut.
10.13
Using the spirit level, align the manual actuator (k) so that it is vertical.
10.14
Mark drill holes for the wall support (l) 40 mm above the triangular handle.
10.15
Drill in accordance with these markings.
10.16
Insert the wall plugs.
10.17
Screw on the wall support.
10.18
Screw the wall bracket (m) into the shower head (n) so that a seal is formed.
10.19
Seal in the wall arm with the shower head and bring into position.
10.20
Establish the water connection.
10.21
Check the water connection for leaks.
10.22
Plug the manual actuator if need be.