- 7 -
ZMI
_001_
2000
1033
85-HDTX53
8
RS_#
SEN_#
AQU_#
V
3.
fm
☞
Lay the system line (not included in delivery, see
(to be provided by the customer) from the power supply to the fittings and loop
through.
☞
Important!
Prior to the assembly process, flush the pipework in accordance with DIN 1988.
Warning!
Only operate taps with the designated filter.
Failure to observe this instruction can result in damage to the tap.
☞
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
☞
Depending on the composition of the wall, special wall plugs may have to be used
(to be provided by the customer).
a: Sensor
Installing the electrical T-distributor
☞
Important!
The components of the electrical T-distributor may only be installed after the power
has been switched off.
☞
For system cable recommendations, see
Chapter 12.
, Accessories.
When using cables other than the system cable, pay attention to the different colour
code. The outer diameter must not exceed 7.5 mm.
10.1
Remove the sheathing (a) of the system cable (approx. 40 mm).
10.2
Push the cap nut (c) onto the system cable (b) up to the limit stop.
☞
The various wire guides are marked with numbers 1 to 4.
A: Union nut
B: FAR-Best.-Nr. 2000104272
FAR-Best.-Nr. 2000104274
FAR-Best.-Nr. 2000100801
FAR-Best.-Nr. 2000100852
10.3
Engage the wires (d) on the wire guides (e) according to their colours.
10.4
Cut off the projecting wire ends flush, i.e. without protrusions.
10.5
Push the union nut (c) onto the electrical T-distributor (f) and tighten it to the required
torque (1.2 Nm).
A
B
1
brown
red
2
white
white
3
blue
blue
4
black
black