![Franke 2000102675 Installation And Operating Instructions Manual Download Page 5](http://html1.mh-extra.com/html/franke/2000102675/2000102675_installation-and-operating-instructions-manual_2327848005.webp)
- 5 -
ZMI
_001_
2000
1026
75-ZAQ
U
A02
2_#S
EN_#A
QU_#V
2.f
m
8. Assembly Instructions
8.1
Prepare the openings (a) for the cables.
8.2
Fasten the bottom part (b) to the wall. The fastening material is not part of the scope
of delivery.
8.3
If required, insert the coding parts (see
8.4
Use the screws (d) to fasten the upper part (c).
8.5
Make a copy of the overview "The Process of Thermal
Disinfection"(see
8.6
Where applicable, enter the plant-specific data.
8.7
Place a copy of the overview "The Process of Thermal Disinfection" next to the key
switch in plain sight.
9. Coding parts
9.1
Insert the coding parts.
• The key switch works like a pushbutton.
• Current flows only as long as the key is being held in position 1.
• The key can only be removed when it is first turned to position 0.
9.2
Do not insert/remove the coding parts.
• The key switch works like a switch.
• Current flows only as long as the key is in position 1.
The key can be removed when it is in position 0 and in position 1.