
17
FIG. 7 -
Adjust PIR2 and MW, close the
detector inserting downwards the coverage
as shown in figure.
Fix the cover using the metric screw.
FIG. 6
- Locate the detector body on the
metallic support and slide It down, then fix
it using the supplied screws.
In order to obtain a passage for the cables,
break the plastic pre-cut using a pointed
object of appropriate diameter, screwdriver
or similar.
Fig. 6
Fig. 8
CORRECT INSTALLATION
Position the detector vertically and perpendicularly to the ground
Fig. 9
WRONG INSTALLATION (detector tilted downwards)
If the detector is not installed perpendicularly to the ground, as shown, operational reliability may result decreased.
Fig. 10
WRONG INSTALLATION (detector tilted upwards)
If the detector is not installed perpendicularly to the ground, as shown, operational reliability may result decreased
Fig. 7
Summary of Contents for 998993
Page 35: ...35 NOTES ...