16
Frabill Instruction Manual• Manuel d’instructions 1-800-558-1005 • email: [email protected] • www.frabill.com
SET UP
1. Stand at the rear of the shelter and pull each U-frame [AA/CC] toward you until the snap buttons snap into position.
2. Move to front side and lift U-Frames [AA/CC] toward you to enclose the base area. NOTE: if U-frames do not pivot
easily check to make sure tent is not caught on framework.
3. Open one of the side doors and enter the shelter.
4. Snap stretcher pole [X] on the #4 U-frame [AA] in the middle. (FIG II) Place the other end into indent in the base [T/U].
5. Snap stretcher pole [Z] onto #4 U-frame [AA] on one side. (FIG II) Snap the other end onto the #3 U-frame [AA].
Repeat this step for other stretcher pole [Z] on other side.
6. Pivot #2 U-frame [BB] vertical from off the ground while extending it so snap buttons are in the center holes.
7. Snap stretcher pole [Y] onto #3 U-frame [AA] on one side. (FIG II) Snap the other end onto the #2 U-frame [BB].
Repeat this step for other stretcher pole [Y] on other side.
8. Stretcher poles [X/Y/Z] should look like image on page 23.
9. Depending on the weather conditions, the fit of the tent can be adjusted by moving the snap buttons to any of the
3 holes in the U-frame [AA/BB/CC].
TENT POSITIONS
Collapsed – Tent down resting on the base fro transport or storage
Closed – Tent rotated over the base onto the ice.
COLLAPSING FOR TRANSPORT
1. Remove stretcher poles [Y].
2. Collapse U-Frame [BB] and pivot to the ground.
3. Remove remaining stretcher poles.
4. Start at the back of the shelter, press the snap button levers in on each side of the U-frame and lower the U-frame
over the inner poles.
5. Repeat on the next U-frame moving towards the front.
6. Close the door with the zipper.
7. Rotate the last U-frame to an upright position and then press the snap button levers in on each side of the U-frame
and lower the u-frame over the inner poles.
8. Fully rotate the frame to the collapsed position.
9. Make sure all material is tucked into base to eliminate dragging the tent material.
10. Place stretcher poles, bucket and tackle inside base.
(1.) Collapsed
(2.) Closed
Safe use and Operation