![FPM Agromehanika 627 152 Assembly / Operation/ Maintenance, Spare Parts List Download Page 13](http://html1.mh-extra.com/html/fpm-agromehanika/627-152/627-152_assembly-operation-maintenance-spare-parts-list_2326007013.webp)
Page 13
INFORMATION FOR READING THE INSTRUCTIONS CORRECTLY
FPM
Boljevac
In this manual, “left” and “right”
corresponds to the direction of
motion.
A – Front part
B – Rear part
C – Left side
D – Right side
(the markings are specified on the
page 10 on the label figure).
Metric thread is used for assembly.
Tighten all the screws during
installation.
Each figure uses symbols showing
the installation location.
Read the content carefully in order
to
assemble
the
rotary
rake
properly.
ROTARY RAKE PACKAGE
FPM Boljevac
For easy transport, IMT 627 169 rotary rake is
packed in a wooden box.
Loose items (tine brackets, guards, tires) are
not attached, but packed separately and
placed in wooden boxes.
a x b x h = 3300 x 2400 x 1500
ATTENTION: THIS SYMBOL IS USED TO WARN YOU ABOUT YOUR
PERSONAL SAFETY. BE CAREFUL!
Summary of Contents for 627 152
Page 22: ...Page 22 CERTIFICATE AND DECLARATION OF CONFORMITY FPM Boljevac...
Page 24: ......