ASSEMBLY
FPM Boljevac
GENERAL INFORMATION
FPM Boljevac
Page 15
Swath board assembly (Figure 3)
Place the swath board support (T) inside the U-
profile (U) on the bracket (K) and secure it to
the bracket using the screw (V) (M12x80).
Subsequently, fit the board (Z) onto the support
(T) in one of the three pre-set positions and
attach it to the lower foot (W) using two screws
(X) (M8x55) in the desired position.
The rotary rakes are attached to all tractors
with a standard three-point linkage.
They are attached to category I and II tractors
(according to ISO 730/I and II) with a 34.9 mm
diameter output shaft with six grooves and no.
of revolutions
n = 540 min
-1
.
Each rotary mower has a frame with a three-
point linkage system and a lower link point
diameter of 22 mm and 28 mm.
For category I tractors, the lower link point (Ø
22 mm) must be attached on the inside (in
relation to the third point) and for category II
tractors, the lower link point
(Ø 28 mm) must be attached to the outside (in
relation to the third point).
For category II tractors, the diameter of the third
point pin must be Ø 25 mm.
Using stabiliser chains, secure the rake to
prevent it swinging sideways.
The plate of the third link point has four
openings for adjusting the optimal operational
position.
The machine is carried during transport.
Summary of Contents for 627 035
Page 22: ...Page 22...