 Issue Date: 10-1-09 

 OIPM 

 Page 2 of 4

 

 

 

 
 
 
 
 

 

 
 
 
 

  

 

1.

Plug heater into a bonded (grounded) receptacle with a power
source conforming to the heater requirements.  Ensure that
total current does not exceed circuit rating.

2.

Adjust heater height by sliding adjustment arm up or down the
upright strut, tighten handle.

3.

Adjust angle of heater to desired position and tighten handle.

4.

To energize heater, flip the toggle switch on housing.

OPERATING INSTRUCTIONS 

WARNING:  DISCONNECT HEATER FROM POWER 
SUPPLY BEFORE SERVICING OR INSPECTING FOR 
ANY REASON.  FAILURE TO DO SO COULD RESULT IN 
ELECTRICAL SHOCK OR INJURY.

 

Quartz tubes and reflectors should be kept free from 
fingerprints, grease and foreign matter.  Periodic washing 
will assure the most efficient heater operation.  Periodically 
wipe reflectors and quartz tubes with a clean, soft cloth; 
also periodically wipe the tubes with alcohol and a clean, 
soft cloth.  Be sure to allow tubes to fully cool down prior to 
cleaning or performing maintenance. 

Replace or repair damaged or worn cords immediately. 

MAINTENANCE 

CAUTION:  DISCONNECT POWER BEFORE INSTALLING OR 
REPLACING QUARTZ TUBES. THESE TUBES CAN AND SHOULD 
BE INSTALLED PRIOR TO MOUNTING HEATER. 

These heaters 

should always be mounted so that the quartz tubes are horizontal, or 
tube burnout will occur. 

     Be sure that the power source conforms to the heater requirements. 

Make sure the quartz tube conforms to your power source 
requirements.  

      INSTALLATION OF HEATING ELEMENTS: 

The heater is equipped with two hi-temperature  14  gauge  silicone    
lead wires and a ground termination.  Make sure power source 
conforms to the heater requirements.  Use only Fostoria quartz 
tubes. 

1. Remove the sheet metal screws that hold fixture end caps

and lamp guard in place.

2. Insert quartz tube in the “L”-shaped slots in heater housing.

3. On each end of the quartz tube, place (1) lead wire ring

terminal, (1) split washer and (1) hex nut on the threaded
stud and 

tighten securely

 (see image below).  Split washers

and hex nuts are provided in hardware package.

4. Replace one end cap and insert one end of lamp guard,

place opposite end of lamp guard into the remaining end cap
and secure with screws.

ASSEMBLY 

IMPORTANT SAFETY

 (continued)

 

 

9.

This heater is intended for general heating applications
ONLY.  It must NOT be used in potentially dangerous
locations such as flammable, explosive, chemical-
laden or wet atmospheres.

10. Be sure all electrical parts are enclosed to prevent

personal injury.

NOTE  –  Use a second wrench to hold the inner hex nut in 
place while tightening the outer hex nut.  Failure to securely 
tighten this connection will cause the element to fail 
prematurely.

 

11. CAUTION:  Check branch voltage.  Heaters should be

operated at voltages no higher than the heating
elements and the heater are designed for.  (Lower 
voltages, however, pose no problem other than a loss
of wattage).

12.

This heater is NOT waterproof and is not intended to
be used in saunas, showers, or in potentially wet
locations.

Figure 1 

Summary of Contents for PCH-48C

Page 1: ...tered it must be replaced with a properly bonded grounded three prong receptacle installed in accordance with the National Electric Code NEC and all applicable local codes and ordinances This work must be done only by a qualified electrician using copper wire only WARNING USE OF A THREE PRONG TO TWO PRONG ADAPTER IS NOT RECOMMENDED Improper connection may create the risk of electrocution Use of su...

Page 2: ... conforms to your power source requirements INSTALLATION OF HEATING ELEMENTS The heater is equipped with two hi temperature 14 gauge silicone lead wires and a ground termination Make sure power source conforms to the heater requirements Use only Fostoria quartz tubes 1 Remove the sheet metal screws that hold fixture end caps and lamp guard in place 2 Insert quartz tube in the L shaped slots in hea...

Page 3: ... One bolt in bottom hole of opposing legs and one bolt in top of second set of opposing legs 3 Tighten support plate bolts 4 Secure castors as shown 5 Assemble heater to column as shown TO INSIDE OF COLUMN OUTIDE OF COLUMN STEP 1 STEP 2 STEP 4 STEP 5 PART MODEL Watts Volts Ph BTU s WT Lbs 58763001 Quartz tube stud termination 1500 120 1 5120 3 REPLACEMENT ELEMENT Quartz Tube Series ...

Page 4: ...equential damages and some states do not allow limitations on how long an implied warranty lasts The above exclusions or limitations may not apply to you During the warranty period TPI Corporation will at its sole option repair or replace any defective parts or products returned freight prepaid to the TPI Corporation factory or such other locations as TPI Corporation may designate Returned product...