II. Model Pin Configuration

To detect and control different model of UPSs, The controller needs the correct

model pin configuration to recognize the UPS model.

The MODEL PORT

I

JP01

J

of the second version(710-01902-02) or the later

version CNTL board should be configured as follows

K

Note

K

“1” indicates that the jumper is connected;

“0”indicates that nothing is connected;

For the pin plugs that are not listed here are not connected.

pin11 & pin12

pin9 & pin10

pin7 & pin8

pin1 & pin2

T6K

0

0

0

1

T6KS

0

0

0

0

T10K

1

0

0

1

T10KS

1

0

0

0

Summary of Contents for EL-10K

Page 1: ...1 SERVICE MANUAL ELIPSE SERIES EL 6K EL 6KS EL 10K EL 10KS FORZA POWER TECHNOLOGIES...

Page 2: ...6 The automatic UPS switch 10 4 2 7 The maintenance bypass switch 10 4 2 8 The battery switch 11 4 2 9 The battery charger 11 4 2 10 The controller 11 4 2 11 The auxiliary power supply 12 4 2 12 The...

Page 3: ...t 37 5 4 2 Fault code definition and possible points 38 5 4 3 Quick Problem Identification process 41 5 4 4 Static Impedance Characteristic Of PCB board 42 5 5 COMPONENT LEVEL REPAIR 44 5 6 TEST AFTER...

Page 4: ...point of view please refer to section characteristic of the product Construction of the product how many pieces of PCB do the product make up please refer to construction of the product Functional blo...

Page 5: ...After service check all the wiring fasten all screws and connectors verify the polarity of batteries polarity of the DC BUS Cap have been correctly connected before applying power supply to the UPS an...

Page 6: ...chnicians to repair and adjust a problematic UPS If the UPS still does not work properly please contact with us and we will be glad to help in solving any problems you may encounter Because of the fol...

Page 7: ...over please follow steps and figures below STEP 1 Remove all the screws including those on the opposite side of the case refer to Figure 3 1 STEP 2 Move the top cover and side cover upward as shown in...

Page 8: ...1 1 Functional block diagram The dashed indicates the interconnection of long backup time model From logical point of view the system comprises An Input output connector terminal block an input EMI fi...

Page 9: ...er module rectifies the AC mains input into DC power of half waveform The rectifier remains in off state under battery mode 4 2 4 The voltage Booster module In line mode the voltage Booster boost the...

Page 10: ...the transfer between bypass and inverter output without any interruption zero transfer time 4 2 7 The maintenance bypass switch The Maintenance Bypass switch is a mechanical rotary switch In normal co...

Page 11: ...troller The controller is the brain of the UPS controls all actions of the UPS response and feedback to the query or action command of the communication interface Basically the controller includes the...

Page 12: ...a bridge between the UPS and human or between the UPS and UPS The communication interface carries parallel operation control signal and common communication signal 4 2 12 The ventilation module To ke...

Page 13: ...ement hereafter is explanation of the PCB 4 3 1 Control Board Control board contains circuits implemented of the controller of the UPS Figure4 3 1 1 is a photo of the Control board Figure4 3 1 1 The C...

Page 14: ...ovides comprehensive information of the UPS Figure 3 3 1 is a photo of a LED panel 4 3 4 I P EMI board O P EMI board I P EMI Board and O P EMI Board is the EMI filter local in the input and output end...

Page 15: ...4 3 4 3 EL 10K s O P EMI 4 3 5 Charger Board Charger board contain the charger circuit Use dfor charging the battery Figure 4 3 5 2 Charger of standard model Figure 4 3 5 2Charger of long backup time...

Page 16: ...16 4 3 6 Parallel Board Parallel board is a dedicated board that has the parallel communication circuit Figure 3 6 Figure 4 3 6 3 Para board of 6 10K...

Page 17: ...tem topology and wiring diagram for help in understanding the electrical construction of the UPS system For more detail of the circuit and wiring connection of all PCB please refer to maintenance sche...

Page 18: ...18 Figure 4 5 EL6KS EL10KS UPS configuration diagram...

Page 19: ...dual charge on the CAPs inside the UPS 4 A tool box that includes Wire cutters and clamps of different shapes Cross screwdrivers Straight screw drivers sleeve spanner of difference diameter solder iro...

Page 20: ...20 Configure the COM1 or COM2 properties as figure 5 2 1 1 b figure 5 2 1 1 b 1 Change the ASCII setup as figure 3 figure 5 2 1 1 C...

Page 21: ...erminal Normally after type a command the acknowledgement of the UPS will be displayed on the next row For example UPSID setting command response with an OK on the next row represent the action to set...

Page 22: ...re MCU Firmware query command Computer send VERMR32 CR UPS reply VERMR32 NNNNN NN CR Means Display version of MCU firmware Positive DC BUS BUS voltage calibration command Computer send BUSP XX CR or B...

Page 23: ...alance 32 15 1C 10 11 Inverter Fault INV Soft Fail A 8D 04 0B 42 52 OP short Fault 0F 0F 0F 0F Over Temp Fault 33 06 0A 43 53 Overload Fault 35 03 09 45 55 Bat SCR Short 0D 0D 0D 0D 0D Communication F...

Page 24: ...to 9 The unit is degree in centigrade m UPS running status before fault b7b6b5b4b3b2b1b0 b7b6b5b4b3b2b1b0 is one byte of binary information Each bit is transferred into ASCII code bn is a binary numbe...

Page 25: ...bypass mode automatically operate the panel to turn the UPS off to bypass before the turning the MBS 4 Switch off the mains input breaker on the rear panel of the UPS Disconnect battery input 5 Disass...

Page 26: ...of the UPS 14 To make sure the calibration has been saved you can turn on the UPS again and check the BUS voltage and Inverter output voltage once again 15 Switch off the mains I P breaker on the rear...

Page 27: ...d securely and case of each piece of battery should show no sign of leakage of acid or deformation Voltage of each piece of battery should be checked if there is any piece that has obvious voltage Dif...

Page 28: ...bration should be carried out in an In depth inspection 5 3 1 3 PCB replacement For updates or repair purposes PCB replacement needs to be carried out Hereafter is the recommended procedure to replace...

Page 29: ...rol board can be referred to the procedure of replacing a PCB stated in the previous section 5 3 2 Parallel Maintenance Operation Recommended wiring of parallel operation system shown in figure 5 3 2...

Page 30: ...el of the UPS off Turn on the EXTERNAL input breaker of the UPS Check the output voltage of each UPS on the terminal block They should be the same And check the voltage difference between the output p...

Page 31: ...eaker switch and the parallel cable 2 Keep the input and output switch of the UPS to add in the off position Connect the input and output cables as well as the battery pack according to the marking on...

Page 32: ...ence is more than 1V the output relay of the UPS may have problem and can not be closed 10 Measure the voltage between JP2s of each UPS JP2 of Unit I JP2 of Unit II and so on to check if the voltage v...

Page 33: ...parallel cables of the remaining UPSs in parallel correctly connected to get most safety the parallel cable should be connected from a closed ring in the parallel system after checking cable has been...

Page 34: ...the UPS parallel system is going to be in INV mode 3 Normally when maintenance bypass switch cover is opened the UPS will transfer to bypass automatically and the maintenance bypass switch can be oper...

Page 35: ...bleshooting but maybe highest cost b Board level Find out which PCB board failed and replace the PCB board It will take medium time medium cost to finish the troubleshooting c Component level Find out...

Page 36: ...a starting point and direction for finding the problem according the information obtained Section 5 4 1 provides a general guidance for selecting a guidance point In most case from the fault warning...

Page 37: ...the UPS Can the UPS be turned on Following instruction Test after repair Yes Yes Follow the display message explanation and solution table Start PCB board static checking process Yes Yes Check with p...

Page 38: ...of the internal critical components increased up to protective threshold Over temperature can be caused by external environment over load or bad ventilation Make sure the ambient temperature is within...

Page 39: ...place a parallel cable 3 Output power wiring of each UPS should be equal 1 3 4 5 6 Keeps Beeping Error Model Model Pin configuration error the CPU does not recognize the configuration Ensure the model...

Page 40: ...v LED green LED Whenever the INV LED is turned on it shows that the loading current is supplied from utility power or battery via the inverter Battery LED orange LED Whenever the battery LED is turned...

Page 41: ...41 5 4 3 Quick Problem Identification process Figure 5 4 3 1 Quick problem identification process...

Page 42: ...open 2 Q301 Q302 A K 1 4M short G K 10 short b Voltage boosting parts Item Checked components DVM Function Reference Value Fail Condition 1 Q306 Q308F Q310 Q307 Q309F Q311 E C 800k short G E 15 8k sh...

Page 43: ...ition 1 F901 F902 F903 F904 F905 F906 0 Open 2 Q907 Q908 S D 1 7M Short G S 32 Short or open 3 D901 D902 D903 DIODE 0 4V 0V 4 Q909 A K 20M Short G K 42 Short 5 4 4 3 Charger of long backup time model...

Page 44: ...cable and connector right to place Please Note the label mark the designation of terminal connector the wire cable should be connected to 2 Check the Wiring again 3 Apply DC Power from power source wi...

Page 45: ...ll power supply to the UPS remain off 2 Clip the voltage probe to the BUS N and BUS N for measurement of the DC BUS voltage 3 Set the DC power source current limiting threshold 3A output voltage 260V...

Page 46: ...pply 9 Endurance test 1 Apply battery of suitable capacity to the battery input of the UPS 2 Control the mains input to turn on off with timer control contactor or equivalent equipment 10s on 2s off 3...

Page 47: ...ear Load Output Waveform Pure Sinewave EFFICIENCY To AC Mode 84 To Battery Mode BATTERY Tower Case Battery Type Panasoinc 12V 7Ah Depending on the capacity of external batteries Panasoinc 12V 9Ah Depe...

Page 48: ...gs 101 kgs Rack Case kgs N A ENVIRONMENT Operating Environment 0 40 C Relative Humidity 20 95 NON CONDENSING Noise Level 55dB 1 meter INTERFACE Smart RS 232 Software supports Windows 98 NT 2000 XP 200...

Page 49: ...MODEL PORT I JP01 J of the second version 710 01902 02 or the later version CNTL board should be configured as follows K Note K 1 indicates that the jumper is connected 0 indicates that nothing is co...

Page 50: ......

Page 51: ...51...

Reviews: