background image

7

Leading Edge

Make copies of this page on copy paper for fine tuning folds

Instruction For Lining Up Folds

Fig. 2 “C” Fold Form

Fold “A”

Fold “B”

Leading Edge

Fig. 1  “Z” fold Form

Leading Edge

Fold “A”

Fold “B”

1.

Place a stack of these sheets into the feeder and fold 

one (1) or two (2) sheets.

2.

Take a folded sheet from the catch tray and lay it on 

top of a pressure seal form lining the leading edge of 

this sheet up with leading edge of the pressure seal 

form.  

3.

-

-

If the folds on this test sheet do not line up with the 

perforated folds on the form, the fold plates need to 

be adjusted up or down to make the folds line up.  

Refer to Fig. 1 for a “Z” fold and Fig. 2 for a “C” fold.  

If fold “A” on the test form is right of the perforation on 

the pressure seal form move the top fold   plate 

stop up.  If  fold ”A” is below move the top fold plate 

stop fold stop down.

If fold “B” on the test form is right of the perforation 

on the pressure seal form move the bottom fold plate 

stop down.  If fold ”B” is to the left move the bottom 

fold plate stop up.

Summary of Contents for AutoSeal FD 2000

Page 1: ...FD 2000 FD 2030 AutoSeal OPERATOR MANUAL FIFTH EDITION 12 07...

Page 2: ...TION 1 SPECIFICATIONS 1 UNPACKING AND SET UP 1 CONTROLS 2 OPERATION 2 FOLD PLATE ADJUSTMENT 3 Setting Custom Folds 3 DAILY MAINTENANCE 4 TROUBLESHOOTING 5 DETERMINING FOLD TYPE 6 TEST SHEET 7 OPTIONAL...

Page 3: ...2030 Up to 35 000 75 000 per month Weight 90 lbs Power supply FD Model 120 volts 60 Hz 3 5 amps FE Model 240 volts 50 Hz 3 5 amps UNPACKING AND SETUP 1 Check package for shipping damage It there is sh...

Page 4: ...tment on page 3 To do this rst loosen two thumbscrews gure 1a on each fold plate Align center bar gure 1b so the marks on each side match up For V folds remove the lower fold plate turn around 180O an...

Page 5: ...plate 3 Measure the length of panel B 4 Adjust the lower fold plate so that the bar lines up with the measurements of panel B 5 Load forms and press start refer to OPERATION on page 2 Setting Custom...

Page 6: ...ares the forms and dissipates heat and static created by laser printers 2 If toner builds up on the metal sealer rollers clean the rollers with a lint free cloth dampened sparingly with a mild househo...

Page 7: ...op cover and remove the upper fold plate Remove the jam clearing tool located under the top fold plate apply the tool to the upper metal roller and turn clockwise until the paper jam is clear Caution...

Page 8: ...DETERMINING FOLD TYPE Two Standard Folds 11 Z 11 C Refer to Operator Manual for custom fold setup 11 Z Fold 11 C Fold Leading glue edge Leading glue edge 11 Z Fold 11 C Fold Glue Glue Glue Glue 6...

Page 9: ...leading edge of the pressure seal form 3 If the folds on this test sheet do not line up with the perforated folds on the form the fold plates need to be adjusted up or down to make the folds line up...

Page 10: ...the machine to its upright position 4 Plug the power cord into the underside of the conveyor 5 Install conveyor mounting bolts gure 5 6 Attach the conveyor to the 2000 2030 7 Install the stacker whee...

Reviews: