Forever Redwood Attached Arched Pergola Assembly Instructions Manual Download Page 3

Attached Garden Pergola                                                                                                         www.foreverredwood.com 
 

Metal Anchors 
to attach 
supports to 
ledger board 

 

 

Post anchors 

 

 

Depending 

on size 

Hardware: 
Bolts and deck 
screws  

Deck Screws              Bolts, washers and nuts              

                

                

 

ASSEMBLY INSTRUCTIONS 

All Pergolas and Pavilions are completely erected in the shop prior to be crating for shipping. All hardware is 
included. All parts are fully sanded, routed, notched, drilled and numbered for ease of reassembly. The parts 
that go together have the same numbers/letters written next to the predrilled holes they attach to. 

 All parts are notched into the part they connect to. You'll find the numbers next to the notches and/or drill holes. 
Before beginning re-assembly, place the parts that go together on the ground with one another so you don't 
have to be searching around in the middle of the reassembly. Most pergolas take less than one day to 
reassemble with one helper. Very large pergolas (6 posts or larger) usually require a second day to finish up. 

Note: 

print the drawings that you approved before start the construction, they are needed to see the distances 

between the posts. 

Step 1

.

 Attach your anchor kit to the ground. 

 

 

 

STEP 1: Place the anchor where it will be installed; 

mark the ground as shown and drill 2 holes as shown 

1/4" wide hole 4" deep 

STEP 2:

  

Ratch down the anchor bolts 

(½” x 4”). Then 

take off the nut before you place the metal anchor (note: 

for wood deck use lag bolt) 

Summary of Contents for Attached Arched Pergola

Page 1: ...ergola www foreverredwood com ______________________________________________________ 866 332 2403 Toll Free 7am 7pm Pacific Time Monday Saturday Example Assembly Instructions for a 17 6 x 10 10 Attach...

Page 2: ...foreverredwood com CONTENT OF BOXES QUANTITY DESCRIPTION DRAWING 2 Posts 2 Mini Posts 4 Main Dual Supports 4 Flat Supports 4 Diagonal Braces 2 Diangonal Braces 7 Slats 1 Ledger Board 9 Rafters 2 Trim...

Page 3: ...find the numbers next to the notches and or drill holes Before beginning re assembly place the parts that go together on the ground with one another so you don t have to be searching around in the mi...

Page 4: ...s to follow once your surface below the Pergola is in place Choose the anchor kit for the appropriate surface Stone Brick or Concrete Anchor Bolts 1 2 for attaching to stone brick or concrete Wood e g...

Page 5: ...y anchored to the leger board Tap the bolt all the way into the wood to set it and then add a washer and nut and lightly tighten Step 4 Attach the mini posts to these supports with 2 bolts 6 x 3 8 was...

Page 6: ...od com Step 6 Attach the end rafters to the posts with one bolt 6 x 3 8 washers nuts per connection One the 2 supports have one large beam already attached or a few 18 pieces depending on size this ad...

Page 7: ...re are 8 screws used per rafter 2 per dual support beams Make sure each rafter s notches are snuggly into the dual support beams before adding the deck screws The dual support beams have lines marking...

Page 8: ...ttach the center slat atop the arches with deck screws The slats have notches to fit into the rafters Step 10 Attach the lattice panels and the rest of the slats on both sides of this first slat Thank...

Reviews: