P| 12
ANDREA´S CUPOLA PAVILION
www.ForeverRedwood.com
Step 9:
Attach triangle 3
(11)
to the posts and to the supports with 3/8´´ x 12´´ Lag Bolts
(H)
.
Step 10:
Attach the short ridge beam
(13)
to the bridge with Angle-G
(31)
and 3/8´´ x 2´´ Lag Bolts
(G)
. After that, attach the
short ridge beam
(13)
to the triangle 3
(11)
whit 3/8´´ x 6´´ Lag Bolts
(D)
.
3/8´´ X 12´´ Lag Bolts
3/8´´ X 6´´ Lag Bolts
3/8´´ X 2´´ Lag Bolts
11
11
13
13
3/8´´ X 2´´ Lag Bolts