background image

PRE-DRILL 

WITH 2MM BIT 

FOR ALL STEPS 

BELOW.

60

MM

SCREWS

8

6c

Attach the Door Handle and Escutcheon

 

to the external face of the Door using their 

supplied fixings. 

Position and secure the Rim Lock Receiver to 

the framework. 

Test the key to ensure the lock 

works accordingly. 

Attach a turn button 

at the top and bottom of 

the Door Panel.

DOOR FIXINGS

INSIDE

OUTSIDE

OUTSIDE

CHECK YOU HAVE ALL YOUR PARTS.

(The parts do not have codes on them. They are listed below should you need to order one.)

The components provided may be heavy. Please lift with caution and with a minimum of 2 people.

Label

Part Code

Description

No. 

A

TPMOD323

Section A - Plain Panel (323x1831mm)

4

B

TPMODPP1114

Section B - Plain Panel (1114x1831mm)

1

C

TPMODW1114

Section B - Window Panel (1114x1831mm)

1

D

TPMODPP1180

Section C - Plain Panel (1180x1831mm)

1

E

TPMODDP

Section D - Door Panel (1180x1831mm)

1

F

TPMOD86FL1180

Floor (1180x1826x70mm)

1

G

TPMODGAB1180

Apex Section (247x45x1180mm)

2

H

45121820PPT

Cover Strip (45x12x1820mm)

8

I

33121631PPT

Door Weather Strip (33x12x1631mm)

2

J

TPMOD64RF

Roof Panel (720x45x1906mm)

2

K

45450085PAII24PT

Truss Block (45x45x85mm)

1

L

45280689PAI24PT

Apex Batten (45x28x689mm)

4

M

95120776PAII24PT

Fascias (95x12x1125mm)

4

N

FIN20010512PT

Finial (105x12x200mm)

1

O

FOTAGFIN

Finial with Badge (105x12x200mm)

1

P

TPASWIN

Window (558x695mm)

1

Q

MTGSH86DR

Door (883x1705mm)

1

R

95150150PPT

Lock Block (95x15x150mm)

1

S

1

T&G Apex 4' x 6' - 1 Window  (TPA46M)  

Felt -  Please contact our aftersales team with your product code if you are missing your 

felt.

TREATED TIMBER CONTAINING A BIOCIDAL PRODUCT

CONTROL OF WOOD DESTROYING ORGANISMS

Active Ingredients

 - Basic Copper Carbonate, Benzalkonium Chloride. (Pressure Treated Sheds)

For use in above-ground and in-ground conditions. Wear gloves when handling freshly treated wood. Avoid breathing wood dust, 

treated or untreated. Do not burn off-cuts.

Summary of Contents for Timberdale 4 x 6 ft Tongue & Groove Shed

Page 1: ...sing your shed from Forest Garden No matter what size garden a shed is the most practical of garden structures Simply follow these step by step instructions and our top tips and you ll be enjoying your shed for many years to come If you have any questions or need advice our friendly team is here to help Forest Garden Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB 77 Camden ...

Page 2: ...ied If you have an existing base and think it s suitable for your new shed to be sited on it is important you check that it is level and doesn t deviate by any more than 15mm from edge to edge If this isn t the case the building will twist causing gaps to appear in the sections and the roof doors and windows to misalign There s more information on base preparation on our website www forestgarden c...

Page 3: ...building well ventilated to avoid mould MAKE SURE YOU POSITION YOUR SHED IN THE BEST LOCATION IN YOUR GARDEN Avoid areas where water pools and is constantly wet Position away from trees and cut back any overhanging foliage which can cause moisture to be trapped against shed walls and debris to collect on the roof 1 RAISE YOUR SHED OFF THE GROUND Ideally any concrete base should be the same footpri...

Page 4: ...ientation during construction This will apply to all of the corners for your chosen shed 4 IDENTIFY YOUR SHED Use the floor plan below to identify the side panel positions before assemblying your shed Use the key and visuals below as a guide PANEL POSITION When assemblying your wall panels ensure the timber framing on the panels are flush at the corners The space left next to the board is for the ...

Page 5: ... by screwing to the wall panels as shown below Attach the other Apex Section to the front panels by screwing to the wall panels as shown below Start at a back corner See the section layout on page 4 to confirm position Secure the corner as shown below Repeat the process for the remaining panels and secure the panels together Make sure that the bottom frame of the wall panel rests on the outer edge...

Page 6: ...els The Roof Panels frame will slot into the Apex Sections frame Ensure the Roof Panels are overhanging the Apex Section by 28mm DOOR WEATHER STRIPS COVER STRIPS ROOF PANEL ROOF PANEL INSIDE TRUSS BLOCK Attach the Cover Strips to the corners of the panels Ensure they are flush to the bottom edge of the panels as shown below 4 ROOF FELT FASCIAS FINIALS Measure out 3 equal lengths of felt Overlap it...

Page 7: ...e they align 50mm INSIDE WINDOW 6a DOOR ASSEMBLY Make sure the outer face of the notch on the hinge is in line with the door edge Position and attach the hinges to the framework behind on the Door Please take note of the hinge position Place the Door into the opening ensuring it s level Make sure the hinges are up against T G boards and fix into place HINGE POSITION INSIDE 6b DOOR LOCK Fix the Loc...

Page 8: ...Section D Door Panel 1180x1831mm 1 F TPMOD86FL1180 Floor 1180x1826x70mm 1 G TPMODGAB1180 Apex Section 247x45x1180mm 2 H 45121820PPT Cover Strip 45x12x1820mm 8 I 33121631PPT Door Weather Strip 33x12x1631mm 2 J TPMOD64RF Roof Panel 720x45x1906mm 2 K 45450085PAII24PT Truss Block 45x45x85mm 1 L 45280689PAI24PT Apex Batten 45x28x689mm 4 M 95120776PAII24PT Fascias 95x12x1125mm 4 N FIN20010512PT Finial 1...

Page 9: ...9 Use the labelled components to help identify the part code and description A B C D E F G H I J K L M N O P Q R ...

Reviews: