EG. DOOR BATTEN
EG. INSIDE CORNER
1a
1b
1c
CONSTRUCTION
1
Start at a back corner.
See the section
layout on page 5 to confirm position.
Secure the corner as shown below.
Repeat the process for remaining panels and
secure
panels together.
Make sure that the
bottom frame of the wall panel rests on the outer
edge of the floor.
Secure the panels into place by
screwing into
the floor.
Screw the door batten
down.
Attach the Apex section
by screwing it into the centre of the wall panels and repeat for the other Apex Section.
6
EG. INTO FLOOR
EG. SIDES
Layout the panels
around your
summerhouse base.
Position the floor
in your desired location. If you have 2
floors, turn the floors upside down to secure the sections
together by screwing through the adjoining bearers.
We recommend to start in a back
corner then
work from the back panels
to the front panels for assembly.
FLOORS & SIDES
PRE-DRILL
WITH 2MM BIT
FOR ALL STEPS
BELOW.
SIDE PANEL
BACK PANEL
7X5 FLOOR
7X7 & 8X6 FLOOR