Forest garden PEACH PLAYHOUSE PH1 Assembly Instructions Download Page 4

 I

L

Place roof sheet on top 
of a 1252mm batten 
making sure that all the 
edges are flush. Secure 
the roof sheet to the 
batten using 4 x 25mm 
screws.

Place the two 694mm 
angled battens against 
the front of the building 
so that they are in line 
with the top of the roof 
and meet at the apex.
Fix each in place using 
2 x 50mm screws.

Place each of the barge boards against the building so that they are in line with the 
pitch of the roof and meet at the apex.  Place the shaped barge boards at the front 
and the straight boards on the back.Fix each in place using 2 x 25mm screws.

Trim off any excess roof felt that may protrude underneath the boards.

Attention:
Take care when 
trimming the 
roof felt.

Unroll both lengths of felt and position each sheet centrally and so they 
overlap each other at the apex. Each sheet should have an equal overhang 
one each end and approximately a 40mm overhang on the eaves. 

Secure the felt with the felt nails provided spaced at 150mm intervals.

Place each roof section 
on to the building so 
that they are in line 
with the apex. Fix the 
roof sections in place 
using 3 x 25mm 
screws for each end, 
screwing into the 
panels framing. Further 
secure the roof using a 
30mm screw through 
the roof into the centre 
of the side panel 
framing.

Maintenance:

 -After assembling the building we recommend that you treat this using a wood 

preservative treatment. Repeat annually

.

- Make sure that there are no sharp edges or screw heads protruding.

Regularly check

All fixing are tight.

All parts for evidence of deterioration and replace in accordance with 

the manufacturers instructions

D

O

 J

Place the 586mm and 530mm 
strips around the outside of the 
window so that they are flush 
and square. Make sure that the 
strip on the right of the window 
is flush with the framing and 
does not interfere with opening 
of the door. Secure each strip 
with 2 x 30mm screws.

When securing the bottom 
strip, take care to position the 
screws towards the bottom the 
strip to make sure you screw 
through the thicker material 
behind.

8

10

9

Apex

Eaves

30mm screw

Summary of Contents for PEACH PLAYHOUSE PH1

Page 1: ...sembly of this product requires a minimum of two adults only PH1 Parts list 14 C Issue 0414 Attention This instruction is used for several different buildings Please quote from the correct parts sheet when ordering replacements MUST PRE DRILL SPIRIT LEVEL D F A G H M E K N L 40120530PAIIDT Strip 530mm Qty 2 PH1PE Plain End Qty 1 12566908 Roof Sheet Qty 2 PH1PP Plain Panel Qty 2 PH1DR Door Qty 1 PW...

Page 2: ...Fix an 1172mm batten pressure treated to the bottom of each panel making sure that it is flush on all sides Fix each batten in place using 2 x 50mm screws B A A C M Place the remaining 1172mm batten so that it bridges the door end and plain end at the top as illustrated Fix this in place using a 50mm screw at each end screwing at an angle Place a corner strip to each corner making sure that it is ...

Page 3: ...t be no less than 12mm The gap on the opening side must be less than 5mm 5 Place the handle half way up the door against the edge of the board Position the magnetic plate on the reverse of the door opposite the handle Use 2 x 25mm screws to fix both the plate and handle to the door screwing from inside 6 Place the door block against the front and in line with the side of the door end Making sure t...

Page 4: ...the felt nails provided spaced at 150mm intervals Place each roof section on to the building so that they are in line with the apex Fix the roof sections in place using 3 x 25mm screws for each end screwing into the panels framing Further secure the roof using a 30mm screw through the roof into the centre of the side panel framing Maintenance After assembling the building we recommend that you tre...

Reviews: