I
L
Place roof sheet on top
of a 1252mm batten
making sure that all the
edges are flush. Secure
the roof sheet to the
batten using 4 x 25mm
screws.
Place the two 694mm
angled battens against
the front of the building
so that they are in line
with the top of the roof
and meet at the apex.
Fix each in place using
2 x 50mm screws.
Place each of the barge boards against the building so that they are in line with the
pitch of the roof and meet at the apex. Place the shaped barge boards at the front
and the straight boards on the back.Fix each in place using 2 x 25mm screws.
Trim off any excess roof felt that may protrude underneath the boards.
Attention:
Take care when
trimming the
roof felt.
Unroll both lengths of felt and position each sheet centrally and so they
overlap each other at the apex. Each sheet should have an equal overhang
one each end and approximately a 40mm overhang on the eaves.
Secure the felt with the felt nails provided spaced at 150mm intervals.
Place each roof section
on to the building so
that they are in line
with the apex. Fix the
roof sections in place
using 3 x 25mm
screws for each end,
screwing into the
panels framing. Further
secure the roof using a
30mm screw through
the roof into the centre
of the side panel
framing.
Maintenance:
-After assembling the building we recommend that you treat this using a wood
preservative treatment. Repeat annually
.
- Make sure that there are no sharp edges or screw heads protruding.
Regularly check
-
All fixing are tight.
-
All parts for evidence of deterioration and replace in accordance with
the manufacturers instructions
D
O
J
Place the 586mm and 530mm
strips around the outside of the
window so that they are flush
and square. Make sure that the
strip on the right of the window
is flush with the framing and
does not interfere with opening
of the door. Secure each strip
with 2 x 30mm screws.
When securing the bottom
strip, take care to position the
screws towards the bottom the
strip to make sure you screw
through the thicker material
behind.
8
10
9
Apex
Eaves
30mm screw