PRE-DRILL
PRE-DRILL
PRE-DRILL
9
d
d
d
d
d
d
Place the front and
back barge boards
against the roof so that
they are in line with the
top of the roof and
meet at the apex. Fix
each in place using 2 x
25mm screws
positioned as shown.
Position and fix the
side barge boards
against the ends of the
roof using 2 x 25mm
screws.
Further secure the
barge board at the
corner screwing into
each of the blocks at
the ends using 2 x
25mm screws for each.
flush
h
h
Take care when
trimming the roof
felt.
Forest Garden Ltd. | Unit 288 | Oak Drive | Hartlebury Trading Estate | Hartlebury | Worcestershire | DY10 4JB
Issue 0118
7
Place a turn
button on the
top and bottom
of the batten.
a
g
a
b
a
c
d
x 6
Fix the smaller piece of
the hinge to the door.
5
d
d
Place the roof sections so that they
line up at the apex. Fix these from
the inside screwing through the apex
boards into the battens using 4 x
25mm screws for each roof section.
Apex Boards
9
Block
d
x 7
Position and line up the hasp
and staple with framing on the
inside of the door.
The top of the hinge
should be in line with the
horizontal batten
Place the felt over the roof so
that there is approximately a
45mm overhang on all sides.
Secure the felt to the roof,
nailing into the ba! ens from
the sides using felt tacks
placed in 150mm intervals.
Cut and fold the felt at the
corners as shown.
h