
7
8
9
Forest Garden Ltd. Unit 288 Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
V
6
U
U
J
W
Place a handrail section (J) on the
veranda so that it is tight against
the door end and flush with the
outside. Fix this to the door end
using 2 x 60mm screws. Further
secure this by fastening it to the
veranda using 2 x 50mm screws
screwing into the bearers
underneath
Place a 1732mm angled post (V)
against the end of the handrail so
that the pitch of the angle is
towards the apex. Fix this in place
using 2 x 50 screws, screwing
through the handrail first.
Fix two of the window (K) hinges to the top of the window as shown. Securing the smaller
half of the hinge using 2 x (3.5 x 30mm) screws. Place the window into the window panel
and fix this in place securing the larger half of the hinge to the batten at the top of the
window gap using 3 x (3.5 x 30mm) screws for each.
Fix the casement stay and pins to the inside of the window and the bottom batten of the
window gap using the screws provided.
Place the 1270mm boards against the underneath of the roof sections so that
they are flush with the ends as shown. Fix each board in place using 3 x (3.5 x
30mm) screws.
K
Fix both of the 800mm strips (U) to the inside of door (F) so they are flush with the top and
bottom of the door and overhang the side by 20mm. Fix each strip in place using 2 x (3.5 x
30mm) screws.
Fix a shoot bolt to the top and bottom of the door. Fix the receiver to the framework between
the two strips as illustrated. Use the 20mm black screws provided.
Still from inside the building line the lock up with the key hole in the door and fix using the 4 x
32mm black screws.
Bottom
Top
Issue 0414