
P a g e
|
8
Mount Bracket
MOUNT BRACKET TO WALL
A
Locate Stud with Stud Finder
B
Verify Gang Box is installed on right side of stud.
Top Bracket hole should be between 35-
60” from floor
.
See page 2 dimensional graphic.
No Gang Box needed if AC Conduit Installation
C
Line up Mounting Bracket opening with Gang Box as
shown, use Level to align Bracket and mark the two
center mounting holes.
D
Use Drill w
ith 7/32” bit to drill pilot into stud.
E
Align Bracket on wall and Install (2) 3/8” x 2
-
1/2” Hex
Lag Bolts into wall using 9/16” Socket to tighten to wall.
(See Figure below).
QTY KIT ITEM
1
MOUNTING BRACKET
2
3/8” X 2
-
1/2” HEX LAG BOLT
TOOLS NEEDED
STUD FINDER
LEVEL
Drill with 7/32” Pilot Bit
9/16”
SOCKET
Install Lag Bolts using
9/16” Hex Head
7/32” Pilot holes
in the stud wall
Gang Box right side stud
mount (Standard Method)
Align Gangbox with opening
in Mounting Bracket
Summary of Contents for Pro NL38-10C823-AA
Page 1: ......
Page 2: ......
Page 7: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 20: ...P a g e 20 ...
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 30: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 43: ...Page 20 ...
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 53: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 66: ...Página 20 ...
Page 67: ......
Page 68: ......
Page 69: ......