
P a g e
|
6
Supplied Equipment
Equipment
1
–
80A Charger
1
–
Mounting Bracket
Hardware Kit
2
–
3/8” x 2
-
1/2” LG Flange Hex Head Lag Bolt
s
6
–
(T20) Torx-head Dog Point Screws
–
M4 x 0.7 x 16 mm (2 extra)
1
–
Connector
–
3 position (Communications)
1
–
Connector
–
2 position (Dark Start
–
Battery Backup)
Equipment List
–
W
hat’s
Needed
TOOLS
Certified Electrician
7/32
” Drill Bit
Stud Finder
Level
CAT I
–
600v Multimeter (minimum)
5/32
”
Hex Head Bit or Allen Wrench
9/16” Wrench or Socket Wrench
Small Flat head Screw Bit (For RS-485 Connectors)
Torx Head (T20) Bit
Torque Driver
Step Drill Bit
–
(If needed for Conduit Connectors
–
1-
1/8”
- 1-3/8
”
holes)
ADDITIONAL ITEMS (Not Included)
1- ¾
” Conduit Connector (see Installation Checklist If Needed)
1-
1” Conduit Connector (see Installation Checklist If Needed)
3 AWG
–
90°C Copper wire should be used
NOTE: Wire
must
have a temperature rating of 90° C or higher for AC Connections (A/L1 and B/L2[N])
80A charger requires a 100 A non-GFCI breaker.
HVDC Wire
–
8 AWG 90°C, 600V
Dark Start Wire
–
16 AWG, 600V to comply with NEC300.3©(1).
Communication Wire
–
18 AWG, 600V to comply with NEC300.3©(1).
Summary of Contents for Pro NL38-10C823-AA
Page 1: ......
Page 2: ......
Page 7: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 20: ...P a g e 20 ...
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 30: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 43: ...Page 20 ...
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 53: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 66: ...Página 20 ...
Page 67: ......
Page 68: ......
Page 69: ......