![Ford 65U Manual Download Page 43](http://html.mh-extra.com/html/ford/65u/65u_manual_2318609043.webp)
43
C
C
ONFIGURATION
ONFIGURATION
L
L
EVEL
EVEL
2
2
—
—
K
K
EYPAD
EYPAD
Outputs 4-8 – Function
Level 2 – Outputs 4-8 keys - Function is
where you decide how the Outputs 4-8
are going to function.
SAVE
Save LEVEL 2 - Outputs - Function key
settings and return to LEVEL 2 - Out-
puts, page 42.
Push On / Push Off
Select “Push On / Push Off” (Key 12) if
you want the Outputs you are configur-
ing to act as a standard Push On / Push
Off switch.
Momentary
Select “Momentary” (Key 13) if you
want the Outputs you are configuring to
act as a Momentary Switch.
8-Second Timer
Select “8-Second Timer” (Key 14) if
you want the Outputs you are configur-
ing to automatically turn itself off after 8
seconds.
Security Timer
Select “Security Timer” (Key 15) if you
want the Outputs you are configuring to
require security operation to turn on and
automatically turn itself off after 8 sec-
onds.
When operating, the security timer re-
quires two key hits to operate. When the
security key is first hit, it will not turn
on. It will not turn on until the SAVE
key is hit immediately following the
security key hit. This gives you your two
key press security timer.
Always leave the
Slide Switch OFF
while reconfiguring
Summary of Contents for 65U
Page 3: ...3 O OPTION PTION C CONTENT ONTENT 65A 65A AND AND 65N P 65N PACKAGES ACKAGES Base Package 65A ...
Page 4: ...O OPTION PTION C CONTENT ONTENT 68P 68P AND AND 65W P 65W PACKAGES ACKAGES ...
Page 5: ...5 O OPTION PTION C CONTENT ONTENT 65U 65U ...
Page 35: ...35 C CONFIGURATION ONFIGURATION C CONFIGURATION ONFIGURATION T TREE REE ...
Page 50: ...S SCHEMATICS CHEMATICS P POWER OWER C CONNECTION ONNECTION P PLACEMENT LACEMENT ...
Page 52: ...S SCHEMATICS CHEMATICS P POWER OWER C CIRCUIT IRCUIT P PLACEMENT LACEMENT ...
Page 53: ...53 S SCHEMATICS CHEMATICS P POWER OWER C CIRCUIT IRCUIT P PLACEMENT LACEMENT ...
Page 54: ...S SCHEMATICS CHEMATICS S SPARE PARE C CIRCUIT IRCUIT P PLACEMENT LACEMENT ...
Page 55: ...55 S SCHEMATICS CHEMATICS S SPARE PARE C CIRCUIT IRCUIT P PLACEMENT LACEMENT ...
Page 56: ...S SCHEMATICS CHEMATICS G GROUND ROUND C CIRCUIT IRCUIT P PLACEMENT LACEMENT ...
Page 57: ...57 S SCHEMATICS CHEMATICS G GROUND ROUND C CIRCUIT IRCUIT P PLACEMENT LACEMENT ...
Page 58: ...S SCHEMATICS CHEMATICS S STROBE TROBE P POWER OWER S SUPPLY UPPLY ...
Page 60: ...S SCHEMATICS CHEMATICS A ALTERNATING LTERNATING H HEADLIGHT EADLIGHT F FLASHER LASHER ...
Page 61: ...61 S SCHEMATICS CHEMATICS H HORN ORN R RING ING T TRANSFER RANSFER ...
Page 63: ...63 S SCHEMATICS CHEMATICS G GLOVE LOVE B BOX OX PDB PDB ...
Page 64: ...S SCHEMATICS CHEMATICS T TRUNK RUNK PDB PDB ...
Page 65: ...65 ...
Page 72: ...N NOTES OTES ...
Page 74: ...C CONFIGURATION ONFIGURATION W WORK ORKS SHEET HEET ...
Page 75: ...75 C CONFIGURATION ONFIGURATION R RELAY ELAY A ASSIGNMENT SSIGNMENT W WORKSHEET ORKSHEET ...